JD450A
Feral as Fk 🐾
Put your duct together externally of the trench. Then just lower it in as a unit.
There are ways and means. A good gang will keep up.
There are ways and means. A good gang will keep up.
Sounds good on paper Rory, Reality is a different thing unfortunately, there will always be a collar that comes out and especially if there only 3 metres long and going 1200 deep.Put your duct together externally of the trench. Then just lower it in as a unit.
There are ways and means. A good gang will keep up.
Hi Kev,Hi.
I’m looking for anyone in the Telford area looking for 3 to 6 weeks work starting next mouth, trenching job.
Can either be with or without there own digger (8 ton minimum) must be willing and able to help out, out of machine as well.
Most of work is on private land.
Try Mayfive equipment Ltd for your trencher, the knowledge this bloke has about trenchers in never ending. If you need a bigger trencher I know of a Mastonbroek sat over Ludlow way.Hi.
ducting is ridged and has to sitting on 75mm of granite dust so will have to go in after trencher.
Probably be quicker if you just let us know what or who you intend to scam?Heck of a trench if your wanting 8ton minimum