Mark
Well-known member
One from today had a 8.5 ton hammer on the machine today. Sat next to pedestrian barrier to show the size.
Now that’s a hammer! What size machine is that on Mark?View attachment 5837
One from today had a 8.5 ton hammer on the machine today. Sat next to pedestrian barrier to show the size.
The covering over the pipe is soft too.tha's an old joint![]()
that could've been interesting,Had a guy out today he looked at it and couldn't work it out, later on another guy came out and it's live and will be sorting it tomorrow at some point as it was diverted before so shouldn't be running through the building.
Also forgot to add on the original post this cable was underneath the original footing for garage that was there about 300mm deeper than the bottom of footing and by under the footing I mean the full 8m length not perpendicular crossing under it![]()
....... before or after you spent the extra time carefully avoiding chewing it upThey were out today and it was a redundant service
They did two visits yesterday both office guys and had a call saying they would be on site for 10am and if we could dig it out for them to deal with it. We worked carefully around it trying not to disturb it too much and tied it up at the height it was laid to not add pressure to it,and had most of the trench dug out by the time they arrived on site........ before or after you spent the extra time carefully avoiding chewing it up![]()
send 'em a bill for your day's efforts, with an explanation of why ....They did two visits yesterday both office guys and had a call saying they would be on site for 10am and if we could dig it out for them to deal with it. We worked carefully around it trying not to disturb it too much and tied it up at the height it was laid to not add pressure to it,and had most of the trench dug out by the time they arrived on site.
Guy jumped in and you would have thought he was wrestling an anaconda the way he was yanking and scraping it. Tested and no live so it was cut.
Would have had the footing dug yesterday if they had sent a jointer out to look at it rather than a planner
Had a feeling it was dead, as when they had the feed moved from a different location (around the new rear extension rather than through it as it was laid) the main was apparently at least 2" thick and plastic coated. All tails from the T were dead. Main thing is, better safe than sorry.send 'em a bill for your day's efforts, with an explanation of why ......... bloody ridiculous
..... presumably whatever it's tee-ed off is also dead
![]()
just tripped over this pic ... not seen it before and thought it'd be appreciated here
View attachment 6299
that is some rock![]()