Building a bridge, Help?

honey_badger

honey_badger

Well-known member
Go on then.....give me a clue how to do that as since my wife upgraded my phone.....my pics are coming out sideways!!! It is hurting my neck just looking at my own posts!!
I do it on my PC. What phone have you got lol
 
Mogman

Mogman

What man as done, man can do, what never has,maybe

Attachments

  • flint 033.jpg
    flint 033.jpg
    170.4 KB · Views: 305
  • flint 036.jpg
    flint 036.jpg
    255.4 KB · Views: 290
Grahams

Grahams

Don't complain - suggest what's better
pettsy

pettsy

Well-known member
One going up here....

 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
One going up here....

let's hope they're raising the revetments 10 ft and ramping up to 'em ...... or they're gonna need a new one next good floods ... again
 
J

Jimoz

Well-known member
Costing him less than I would of guessed. What you think to that lift plan @V8Druid digger and telehandler presumably tracking and driving while they've got it up.
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Costing him less than I would of guessed. What you think to that lift plan @V8Druid digger and telehandler presumably tracking and driving while they've got it up.
aye fine ... it'd only need to be a few inches off the deck for the tele and the 360 could slew for most of it .. sit it and re-position ... bit of care and'd be no prob.s ...... just do it under cover of darkness or a Sunday :LOL::LOL:
 
T whiting

T whiting

Well-known member
What's the problem with tracking while lifting? what will those beams weigh @V8Druid ?
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
What's the problem with tracking while lifting? what will those beams weigh @V8Druid ?
nowt on a firm, level surface and you're within a safe working radius .... soon as you hit a bump or a dip .. that changes .. river bed doesn't constitute a firm level surface ... I'd slew, sit it, move and slew again ...
beams look to be 914 x 305 x 224kg/m , so at 18m would be circa 4.03t each .. 2t per machine .. as long as both lifting from similar points and lift is kept level
if the 360 was good for 4t say and he'd leveled the river bed to track on, I'd track it, but difficult to match speeds of two machines .. safer to slew, etc., IMHDO, to match the speed of the tele ... better control
 
Quattromike

Quattromike

Well member-known
Hi Guys, looking at a yard, the only access is over a small burn, there is currently a bridge in place which needs replaced.
The current bridge consists of 2 steel beams spanning the burn with 20x 200mm x 100mm x 2.4m sleepers, they are past their best.
The new bridge needs to be wider, around 3.6 metres, the span over the burn is 4 metres.
How would you go about a new bridge? Any previous examples and pictures?
Did you get a bridge fitted?
I've had a customer asking about a bridge in his garden, 9m span with timber sleepers for deck. I thought a nice little foot bridge in garden to which they replied oh I need to get vehicles over it. So I'm thinking the odd car might go over but no apparently has planning for a shed and looking at getting lorries to it 😳, bit of a game changer. I think they need to rethink it but they insist just a simple burn crossing. What do people use for such a crossing?
 
JD450A

JD450A

Feral as Fk 🐾
Did you get a bridge fitted?
I've had a customer asking about a bridge in his garden, 9m span with timber sleepers for deck. I thought a nice little foot bridge in garden to which they replied oh I need to get vehicles over it. So I'm thinking the odd car might go over but no apparently has planning for a shed and looking at getting lorries to it 😳, bit of a game changer. I think they need to rethink it but they insist just a simple burn crossing. What do people use for such a crossing?
Bailey bridge.....

In all seriousness as soon as it goes from pedestrian - traffic or becomes about 2 or more meters span it wants to be a engineer job.
 
Giles

Giles

Well-known member
so don't dig the bank ... step back in a metre or so, dig a gert hole and fill with conc ... increase the bridge span a metre or so, plus, either side and keep away from the watercourse all together ... may cost a little more, but could save a lot of buggeration :rolleyes:
I think anything within 8m is notifiable to ea last time I got a slapped wrist working on the 1 mile of the goyt river we own they stated that. But that’s a medium river.
 
Giles

Giles

Well-known member
I got a quote few years ago from beaver bridges was pretty reasonable
 

Attachments

  • 18BB861D-EC19-40C7-897A-9D1DF2BBA4E8.png
    18BB861D-EC19-40C7-897A-9D1DF2BBA4E8.png
    922.1 KB · Views: 277
  • 7D58DF06-3A28-408D-B48E-B08C31AED759.png
    7D58DF06-3A28-408D-B48E-B08C31AED759.png
    318.9 KB · Views: 238
Lancs Lad

Lancs Lad

Well-known member
Reminds me...farmer over the back...his old sleeper bridge gave way as he drove over with slurry tanker on..shame I didn't get pics...it's a a fair drop into the brook..😣 Nearly pulled trac in as well....so the next year he gets brand bridge installed .... beginning of last year...his foundations gave up in the storm..:
Still waiting on insurance reckons they want 30k to sort.