I do it on my PC. What phone have you got lolGo on then.....give me a clue how to do that as since my wife upgraded my phone.....my pics are coming out sideways!!! It is hurting my neck just looking at my own posts!!
Any pics of it finished mon?!
was about to say ... shown 'em yer Kub duckthis seems hard work on my mac book
all steeled up A 393 top and bottom 300mm thick i think
View attachment 14517
and a cheeky picture of the duck I converted from a worn out steel tracked kh 66 to a well you can see the results
View attachment 14516
let's hope they're raising the revetments 10 ft and ramping up to 'em ...... or they're gonna need a new one next good floods ... againOne going up here....
New bridge,work in progress
Thought I’d share some progress pics of a river bridge we are having built by a local engineering company. It’s a 60ft single span, 15ft width. Previous one was washed away in last years floods leaving us no access to 77 acres of grass land. :(thefarmingforum.co.uk
aye fine ... it'd only need to be a few inches off the deck for the tele and the 360 could slew for most of it .. sit it and re-position ... bit of care and'd be no prob.s ...... just do it under cover of darkness or a SundayCosting him less than I would of guessed. What you think to that lift plan @V8Druid digger and telehandler presumably tracking and driving while they've got it up.
nowt on a firm, level surface and you're within a safe working radius .... soon as you hit a bump or a dip .. that changes .. river bed doesn't constitute a firm level surface ... I'd slew, sit it, move and slew again ...What's the problem with tracking while lifting? what will those beams weigh @V8Druid ?
Did you get a bridge fitted?Hi Guys, looking at a yard, the only access is over a small burn, there is currently a bridge in place which needs replaced.
The current bridge consists of 2 steel beams spanning the burn with 20x 200mm x 100mm x 2.4m sleepers, they are past their best.
The new bridge needs to be wider, around 3.6 metres, the span over the burn is 4 metres.
How would you go about a new bridge? Any previous examples and pictures?
Bailey bridge.....Did you get a bridge fitted?
I've had a customer asking about a bridge in his garden, 9m span with timber sleepers for deck. I thought a nice little foot bridge in garden to which they replied oh I need to get vehicles over it. So I'm thinking the odd car might go over but no apparently has planning for a shed and looking at getting lorries to it, bit of a game changer. I think they need to rethink it but they insist just a simple burn crossing. What do people use for such a crossing?
I think anything within 8m is notifiable to ea last time I got a slapped wrist working on the 1 mile of the goyt river we own they stated that. But that’s a medium river.so don't dig the bank ... step back in a metre or so, dig a gert hole and fill with conc ... increase the bridge span a metre or so, plus, either side and keep away from the watercourse all together ... may cost a little more, but could save a lot of buggeration![]()