Underfloor heatingAnd the machine store and workshop floor trimmed to within 5mm ready for underfloor heating and concrete this week
I'm just doing the leaver pulling but it looks like spaghetti in there atm I'll grab some photos of the pipes down on Monday the slabs 180mm the reasoning for the tight tolerance is that they want to drill racking into the slab and the main contractor is worried about liability if they drill a pipe
wanna make sure they don't allow anyone on site with a drill longer than 140mmYep nothing but luxury for those parts it sounds like it'll be a disaster but time will tell
That might still be 40mm too long!!wanna make sure they don't allow anyone on site with a drill longer than 140mm![]()
![]()
![]()
That might still be 40mm too long!!
In that case even 40mm is too long!!Yes the pipes are on top of the meshthere supposed to be fitting 75mm sleeve anchors
It'll be very nice massive concrete yard outside too though I don't think I'd want to have to find the money to pay for itIt’s going to be a very nice shed. Puts my ex farmyard asbestos covered barn to shame.
You mean a bounce back loan won’t cover it?It'll be very nice massive concrete yard outside too though I don't think I'd want to have to find the money to pay for it
might buy the mesh and the pipework Gra,You mean a bounce back loan won’t cover it?
Could only dream of that round here...a duck off the tarmacRight I've moved onto a little job 48m of perforated drain for a designed soakaway for the barn conversions my dad's just started sorted the leaves for all the drainage all finished and the old farmyard scraped down to decent stone for working off in 3 days with just me and the duck
View attachment 19043View attachment 19045View attachment 19046View attachment 19047