Monkeybusiness

Well-known member
No rock armour in that area, just pumped sand up to the concrete promenade. Thought it was a strange bucket choice 🤷🏻‍♂️

Here’s a video from further down the coast a couple of years ago…

Makes sense why it’s such a lump of a digger now - dragging that pipe around needs a bit of muscle!
 
S

Stroppymonkey

Well-known member
Nearly fed up with this job. Massively underestimated the work. Allowed 72 hours and we are at nearly 89 hours so far and another day making good left. Services everywhere and most of the ground is like a quarry. Never seen so much stone. Doubled the pipe bedding Just the last bit (in photo) to tidy up tomorrow and will need to riddle the stone out so we can dump spoil in the customers paddock low spots. Sun burnt every day and tea and cakes from customer at 12pm and 4pm every day. If I had priced it correctly then it would be a great job. Fortunately its an estimate not a quote - and customer is likely to be fine, but I hate having that conversation.
Had a local guy in with 3 tonner this morning to rip out the stuff that he could get to. He is £36 per hour including fuel AND machine which really shocked me. He runs a small team with several machines so must be making enough to survive.. but still....

1747857698602.png
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Nearly fed up with this job. Massively underestimated the work. Allowed 72 hours and we are at nearly 89 hours so far and another day making good left. Services everywhere and most of the ground is like a quarry. Never seen so much stone. Doubled the pipe bedding Just the last bit (in photo) to tidy up tomorrow and will need to riddle the stone out so we can dump spoil in the customers paddock low spots. Sun burnt every day and tea and cakes from customer at 12pm and 4pm every day. If I had priced it correctly then it would be a great job. Fortunately its an estimate not a quote - and customer is likely to be fine, but I hate having that conversation.
Had a local guy in with 3 tonner this morning to rip out the stuff that he could get to. He is £36 per hour including fuel AND machine which really shocked me. He runs a small team with several machines so must be making enough to survive.. but still....

View attachment 72499
it happens - and if the customer is decent and you've not 'slacked', they'll usually be understanding - not got X-ray vision for what's in the ground :rolleyes::(
 
TiltyShaun

TiltyShaun

Well-known member
Nearly fed up with this job. Massively underestimated the work. Allowed 72 hours and we are at nearly 89 hours so far and another day making good left. Services everywhere and most of the ground is like a quarry. Never seen so much stone. Doubled the pipe bedding Just the last bit (in photo) to tidy up tomorrow and will need to riddle the stone out so we can dump spoil in the customers paddock low spots. Sun burnt every day and tea and cakes from customer at 12pm and 4pm every day. If I had priced it correctly then it would be a great job. Fortunately its an estimate not a quote - and customer is likely to be fine, but I hate having that conversation.
Had a local guy in with 3 tonner this morning to rip out the stuff that he could get to. He is £36 per hour including fuel AND machine which really shocked me. He runs a small team with several machines so must be making enough to survive.. but still....

View attachment 72499
My optimistic outlook ruined price work for me. Happy to charge a fair rate and plod along. I might not set land speed records but clients happy with the tidy results.
 
D

DaveDCB

Well-known member
Nearly fed up with this job. Massively underestimated the work. Allowed 72 hours and we are at nearly 89 hours so far and another day making good left. Services everywhere and most of the ground is like a quarry. Never seen so much stone. Doubled the pipe bedding Just the last bit (in photo) to tidy up tomorrow and will need to riddle the stone out so we can dump spoil in the customers paddock low spots. Sun burnt every day and tea and cakes from customer at 12pm and 4pm every day. If I had priced it correctly then it would be a great job. Fortunately its an estimate not a quote - and customer is likely to be fine, but I hate having that conversation.
Had a local guy in with 3 tonner this morning to rip out the stuff that he could get to. He is £36 per hour including fuel AND machine which really shocked me. He runs a small team with several machines so must be making enough to survive.. but still....

View attachment 72499
On a price I always had a ‘hard ground/rock’ clause that would introduce a day rate for anything unforeseen. You never know what you’ll come across!
 
Giles

Giles

Well-known member
Nearly fed up with this job. Massively underestimated the work. Allowed 72 hours and we are at nearly 89 hours so far and another day making good left. Services everywhere and most of the ground is like a quarry. Never seen so much stone. Doubled the pipe bedding Just the last bit (in photo) to tidy up tomorrow and will need to riddle the stone out so we can dump spoil in the customers paddock low spots. Sun burnt every day and tea and cakes from customer at 12pm and 4pm every day. If I had priced it correctly then it would be a great job. Fortunately its an estimate not a quote - and customer is likely to be fine, but I hate having that conversation.
Had a local guy in with 3 tonner this morning to rip out the stuff that he could get to. He is £36 per hour including fuel AND machine which really shocked me. He runs a small team with several machines so must be making enough to survive.. but still....

View attachment 72499
In reality subbing him in for half a day to dig the trench would have been beneficial to you and customer rather than struggling with e10 he’d have had it done with the 3 ton.
 
Giles

Giles

Well-known member
Will be shaped for playing with pipe, holed to let water out. It's not really digging just tending to the pipe so the dozer can spread the material.

Exactly what Rory said so he can scoop pipe up and sand and water drops out
 
S

Stroppymonkey

Well-known member
In reality subbing him in for half a day to dig the trench would have been beneficial to you and customer rather than struggling with e10 he’d have had it done with the 3 ton.
Yes that’s what we did , the trenching we did with E10 was where anything bigger wouldn’t fit :-(
 