Routy56
Well-known member
Job jobbed 
The boys rocked up with the chipper and we dispatched the hedge on the first day...
Danny (the boss) turned up with the doughnuts for the boys
2nd day today saw me digging out remaining roots and rubbish.
Then grading it back ready for gravel boards.
Because the lane and site is sloping in two directions, the height difference varied between 2 and 4 feet.
So they are sticking in 10' and 9' posts with 2 or 3 gravel boards
String line in and guy in charge of fencing well pleased - "Good to see an operator that is so smooth and take care on the job"
Working with these young guys made me feel young again.
Neuson loaded ready for the off on a POETS DAY
The boys rocked up with the chipper and we dispatched the hedge on the first day...
Danny (the boss) turned up with the doughnuts for the boys
2nd day today saw me digging out remaining roots and rubbish.
Then grading it back ready for gravel boards.
Because the lane and site is sloping in two directions, the height difference varied between 2 and 4 feet.
So they are sticking in 10' and 9' posts with 2 or 3 gravel boards
String line in and guy in charge of fencing well pleased - "Good to see an operator that is so smooth and take care on the job"
Working with these young guys made me feel young again.
Neuson loaded ready for the off on a POETS DAY