Yard hardstanding

wee_gus

wee_gus

Well-known member
Over the past couple of months with the bleak weather our yard has literally turned to mush.
It does have high traffic and does run slightly down to our workshops.

We have tried recycled cold plannings and rolling it in but it doesn't last long.

Concrete could be an option but at £150 a cube it soon mounts up.

I've attached a couple of pictures of the yard to give you an idea,

I'm fed up with the guys up cleaning up everyone a truck comes in or machine comes in plus feet are always mucky


Anyone any suggestions on what we could do?
 

Attachments

  • dji_fly_20230723_150026_24_1690121001571_photo.jpeg
    dji_fly_20230723_150026_24_1690121001571_photo.jpeg
    211.4 KB · Views: 227
  • IMG_6841.png
    IMG_6841.png
    1.3 MB · Views: 242
B

bobthebuilder

Well-known member
can you get some drainage in th
Over the past couple of months with the bleak weather our yard has literally turned to mush.
It does have high traffic and does run slightly down to our workshops.

We have tried recycled cold plannings and rolling it in but it doesn't last long.

Concrete could be an option but at £150 a cube it soon mounts up.

I've attached a couple of pictures of the yard to give you an idea,

I'm fed up with the guys up cleaning up everyone a truck comes in or machine comes in plus feet are always mucky


Anyone any suggestions on what we could do?
can you get some drainage in there out towards the rear corner behind lorrys ?
 
S

Smiffy

Well-known member
Over the past couple of months with the bleak weather our yard has literally turned to mush.
It does have high traffic and does run slightly down to our workshops.

We have tried recycled cold plannings and rolling it in but it doesn't last long.

Concrete could be an option but at £150 a cube it soon mounts up.

I've attached a couple of pictures of the yard to give you an idea,

I'm fed up with the guys up cleaning up everyone a truck comes in or machine comes in plus feet are always mucky


Anyone any suggestions on what we could do?

Tarmac.
If it's a good solid base to begin with just put some 20mm binder down. Can lay it yourself if a machine rather than getting a paver in.
 
wee_gus

wee_gus

Well-known member
Tarmac.
If it's a good solid base to begin with just put some 20mm binder down. Can lay it yourself if a machine rather than getting a paver in.
I did think about this but how would that cope with tracked machines? We don't get much bigger than 40tonners in.

Laying it is not a problem we have access to a paver
 
Bri963

Bri963

Well-known member
I’d put a good layer of demolition waste down, big lumps, track it as flat as you can, and put the planings back on top. Done a few areas like that over the years. When your 40 tonners churn it up it’s easy to knock the top flat.
 
S

Smiffy

Well-known member
I did think about this but how would that cope with tracked machines? We don't get much bigger than 40tonners in.

Laying it is not a problem we have access to a paver

Depends on the frequency and drivers I would think. Wouldn't be as good as concrete but makes everything clean and tidy and will put up with a reasonable amount of abuse.
Could you divide the yard up and have a concrete apron for machines. Tarmac the high traffic areas that machines don't need to travel on and leave the parking as road plannings?
 
wee_gus

wee_gus

Well-known member
Depends on the frequency and drivers I would think. Wouldn't be as good as concrete but makes everything clean and tidy and will put up with a reasonable amount of abuse.
Could you divide the yard up and have a concrete apron for machines. Tarmac the high traffic areas that machines don't need to travel on and leave the parking as road plannings?
Yea we could split it up as we have 2 access gates but only predominantly use the one where the trucks are parked up.

Might speak to the tar lads and see what he says.

Cement stabilisation
That was also a thought, just unsure if it would last?
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Over the past couple of months with the bleak weather our yard has literally turned to mush.
It does have high traffic and does run slightly down to our workshops.

We have tried recycled cold plannings and rolling it in but it doesn't last long.

Concrete could be an option but at £150 a cube it soon mounts up.

I've attached a couple of pictures of the yard to give you an idea,

I'm fed up with the guys up cleaning up everyone a truck comes in or machine comes in plus feet are always mucky


Anyone any suggestions on what we could do?
is it all your yard Gus?
how about having it 'stabilised' by those guys who chew it all up and mix cement in with it .. seems to give very good results

edit - should've read down the page first -- as Rory says 👆👆
 
Storrsy

Storrsy

Well-known member
is it all your yard Gus?
how about having it 'stabilised' by those guys who chew it all up and mix cement in with it .. seems to give very good results

edit - should've read down the page first -- as Rory says 👆👆
It works well with farm tracks going up and down but not sure it would hold up to steel tracks skewing around on it...
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
It works well with farm tracks going up and down but not sure it would hold up to steel tracks skewing around on it...
some one on CEF had their plant yard done .. went down a good 12-14" and said it was like concrete afterwards :giggle:
 
wee_gus

wee_gus

Well-known member
is it all your yard Gus?
how about having it 'stabilised' by those guys who chew it all up and mix cement in with it .. seems to give very good results

edit - should've read down the page first -- as Rory says 👆👆
Yea the whole yard is ours.
It works well with farm tracks going up and down but not sure it would hold up to steel tracks skewing around on it...
Yea that and putting trailers in over the pit and brake tester certainly chew it up at the moment.
I've a man down near reading who does work in scotland doing soil stabilisation so might give him a call and see what he says.
 
Left hooker

Left hooker

Well-known member
It works well with farm tracks going up and down but not sure it would hold up to steel tracks skewing around on it...
One outfit doing it did the Ivor king yard where they track the big piling machines around on it 6" thick when they cut the edge to tie on for another section a year or so later
 
S

Smiffy

Well-known member
A green waste yard in Bromley had the cement stabilization done and it didn't fair to well. It was done in very cold conditions that may have been the reason but running a bucket brush across it would flick the aggregate up. More prone to it at the joints between the runs, so they ended up with a surface like inverted speed bumps across the whole yard.
 
JD450A

JD450A

Feral as Fk 🐾
A green waste yard in Bromley had the cement stabilization done and it didn't fair to well. It was done in very cold conditions that may have been the reason but running a bucket brush across it would flick the aggregate up. More prone to it at the joints between the runs, so they ended up with a surface like inverted speed bumps across the whole yard.
Sounds like not enough cement and not enough overlap. Also if there was existing organic matter in the soil you've no chance as it impedes the chemical reaction in both cement and lime.
 
Storrsy

Storrsy

Well-known member
Sounds like not enough cement and not enough overlap. Also if there was existing organic matter in the soil you've no chance as it impedes the chemical reaction in both cement and lime.
On a cost analysis at some stage it must get to the point where you must as well be done with it and concrete it. Can imagine a fair whack of cement needs using to stand any chance and then as you say risk of failure due to other circumstances/soil type etc. even if it's down 12/18" deep etc I cant see how a tracked machine isn't going to gradually scuff away at the top surface- only needs to aggitate an inch or two to create a sticky/messy finish when it's wet?
 
S

Stroppymonkey

Well-known member
Talking of yard maintenance - never used one of these but looking for something to carry out occasionally cleaning on concrete and well made stone tracks. This one is looking cheapish, but no idea how well it would work as it’s build for paddocks not tracks, but same principle as any sweeper but a bigger collection box?
 

Attachments

  • IMG_2588.png
    IMG_2588.png
    714 KB · Views: 207
S

Smiffy

Well-known member
Talking of yard maintenance - never used one of these but looking for something to carry out occasionally cleaning on concrete and well made stone tracks. This one is looking cheapish, but no idea how well it would work as it’s build for paddocks not tracks, but same principle as any sweeper but a bigger collection box?

Paddock sweepers usually run slower, have wider brush spacings and that one looks to pick the material up carry it over the top of the brush and throw it backwards.
This is the worse design. Jcb telehandler mounted ones do the same.
Bucket brush style where it flicks it straight back into the bucket does a much much better job.
 
Top