You guys remember this job?
View attachment 50458
Well we reversed it today! She's sold up. Moved into rented, so no doubt we will have to move it AGAIN, and knowing my luck, it'll be a crane job next time
Easier because we had the full width ramp and electric winch this time, plus the Kubota with the amazing bi-speed turn to shunt it. Harder (much harder) as this trailer is 16' not 14'! Somehow we got it on, with assisance from the Tirfor winch when we went too far with the steering lock and to hold it back as she went over the breakover point (thank God for those trees)
Getting it out was insaneley tight. We had to winch it back into and across the garden as the kubota couldn't quite push it up the slight incline when loaded, then unhitched and repositioned the kubota to start getting it through the gateway (the post for which of course wouldn't pull out, we had to cut it off).Then unhitch and adjust the tractor angle two more times before getting it out to the road. Nasty tailswing on that trailer.
A nerve wracking crawl down the lane (mag mount gypo beacon on the roof and some snazzy battery mag light flashers on the sides) with the polesaw, cutting off all the branches that had grown back since we last did it.... Relief when we got to the main road and then Will following behind, on the radio constantly telling me to move to the middle of the road to avoid the stuff the council hasn't cut for years. A nasty blind turn off the main road (he went ahead and radioed when it was safe to take position on the offside for the left turn) and then we were at the new place, which luckily was a field. Only damage a slight dent in the chimney cowling.
Big digger I'd dropped there yesterday (cut the grass with the flail collector too) so we had a good idea of where the best level area was. Soon had a couple of holes set out, dug and filled level with a load of stone from yesterdays job that I'd saved, then swung the bolted together sleepers in with the grab and tapped them home. NivComp said both were within 10mm, so that'll do. Came off the trailer relatively easily, but we still had to head back to the yard, pick up the micro and some stuff to fix the mess back at the first house. Did a reasonable job (god, it's hard work taking out a post that you put in properly in the first place!!) although I had to channel my inner Rogue Trader (wasn't hard) and scribe a spare tile with a saw before breaking it (in three pieces, oops) and sticking it back on the pillar with Stixall. Never mind, the gaff is sold and it looks OK from below! The lads made a badgers arse of the gravelboard too but it was half five on a friday and the customer was over the moon, so off we fked (after a beer each and sharing a pack of crisps) back to the yard to throw things inside and call it a day.
All that graft (and I still got to put tools away tomorrow and empty the tipper) for £950 profit after paying the lads and materials. Should have charged more- who else could have done it?? About a day and half including mowing and putting the tools away tomorrow. Never mind, there'll be a third time.
View attachment 50459View attachment 50460View attachment 50461View attachment 50462View attachment 50463View attachment 50464View attachment 50465View attachment 50466