A
AHPP
Well-known member
The secret to shooting fifties and chain guns is making someone else carry them and pay for the ammunition.
Would a machine with a grading bucket just working site over fire pass not be easier? Just to catch all the lumps and tyres. That looks like a stressful day.This is the job that keeps on giving - all of these were collected today (all pics are of different blockages…)
It’sWould a machine with a grading bucket just working site over fire pass not be easier? Just to catch all the lumps and tyres. That looks like a stressful day.
It’s 30 acres and only wants a quick pass to knock the (now largely) overhead vegetation down.Would a machine with a grading bucket just working site over fire pass not be easier? Just to catch all the lumps and tyres. That looks like a stressful day.
30 acresIt’s
It’s 30 acres and only wants a quick pass to knock the (now largely) overhead vegetation down.
Today has been a ‘new’ area which is landlocked with apparently no access but has benefitted from the joys of the fly-tippers. All of the issues are within scumbag-throwing distance of the boundaries.
Sorted now, bit of tidying up tomorrow and back to my own bed!
Think I’d of sent in a self propelled sprayer in afew months back loaded with roundup, would be clear as a whistle now …. But I guess the main contractor wasn’t that forward thinking30 acresokay I retract my comment
They are usually following immediately behind me with diggers and dozers - I think this one got held up as another adjoining piece of land potentially became available which alters the layout of the development.Think I’d of sent in a self propelled sprayer in afew months back loaded with roundup, would be clear as a whistle now …. But I guess the main contractor wasn’t that forward thinking![]()
I hope you're charging them wellThis is the job that keeps on giving - all of these were collected today (all pics are of different blockages…)
I’ve been learning how to charge from @Mogman - it helps me to see beyond the frustrations!I hope you're charging them well![]()
I cleared a shitty site of over grown weeds and s**t but used a set of disc’s behind the big tyred dumper did a fair job and no blockagesThis is the job that keeps on giving - all of these were collected today (all pics are of different blockages…)
A big saving in manual labour already!View attachment 49697
First job out and thought I better be sensible and drop it off, was a decent stump (thats the 600 bucket).... might of not been necessary with a ripper but thought I better not fook it in the 1st 1/2hr.
Afterwards it rapidly came into its own, this photo is surely a contender for the front cover of engcon France's monthly magazineView attachment 49698
Probably paid for itself already!View attachment 49697
First job out and thought I better be sensible and drop it off, was a decent stump (thats the 600 bucket).... might of not been necessary with a ripper but thought I better not fook it in the 1st 1/2hr.
Afterwards it rapidly came into its own, this photo is surely a contender for the front cover of engcon France's monthly magazineView attachment 49698
Nice bit of kit, which has some pretty grey areas of operationNew toy on site for a few months. Seems to be worth the money on a tight site atm. Very useful!
Nice bit of kit, which has some pretty grey areas of operation
does the operator have a crane operators ticket to comply with suspended load operations?
similarly does the rigger banksman have the necessary qualifications to be doing what he's doing?
these roto FLTs/telehandlers are lovely things, but they are such a crossover unit, there are such a lot of reg.s to comply with ... as said, on such a tight site, a 'proper' crane may well be a more suitable tool for the job.
We will get ‘proper’ cranes in for steel lifts etc but for day to day site handling this was a option we’ve wanted to try for a while. We did look into a small tower crane but seemed bit more agg than we wanted and having to permanently allocate the space for it was a bit of a killer.Nice bit of kit, which has some pretty grey areas of operation
does the operator have a crane operators ticket to comply with suspended load operations?
similarly does the rigger banksman have the necessary qualifications to be doing what he's doing?