Lancs Lad
Well-known member
Been using the M42 a lot lately .... After initially and still now completely pissed off with the traffic I have had plenty of time to study the concrete barrier works.
Seems a completely different approach to normal seems to be a smaller contractor with a lot less machinery some very nice liebhers.
They basically just digging up laying precast blocks about 16 foot long then bolting the new concrete barrier to that with some kind of automated drilling rig looks a very neat setup and fast.
Nice to see some innovation
Seems a completely different approach to normal seems to be a smaller contractor with a lot less machinery some very nice liebhers.
They basically just digging up laying precast blocks about 16 foot long then bolting the new concrete barrier to that with some kind of automated drilling rig looks a very neat setup and fast.
Nice to see some innovation