Regy53
I like cake
I know I know 
just another one to add to the jobs list
the joys of premises Ross ....I know I knowjust another one to add to the jobs list
I use it with consideration on the location, I don't like to bury it under tiles but will use it everywhere else. I do try to hide my pipes though.I use it out of sight, always copper when on show. Important thing is to mark insert depth before pushing pipe together![]()
Great install although the condensate pipe spoils itI donāt like burying any pipes internally regardless of material, I just explain the risks to customer and let them choose.
Copper sits straight in clips whereas plastic wonāt (unless you use straight lengths) Hereās of my installs, couldnāt do it that neatly in plastic!
View attachment 7710
Great install although the condensate pipe spoils it
Quick Q - Will be installing a new oil boiler very soon. Was thinking of a nice Grant VortexBlue......
.....do you have experience and/or thoughts about these low Nox boilers![]()
I hope youāve improved since sending me a three ton size 9ā bucket for a 1.5t machine, with wonky bosses to boot.
Luckily Iāve just ordered an E27 so I might finally use the f****ng thing.
and you haven't had a play with one ???? like buying a car you've never drivenHave you got your E27 yet? Any good? Iāve put a deposit down on one today too.
and you haven't had a play with one ???? like buying a car you've never driven![]()
Whatās the lead time on these E27ās? I know someone who has been without theirs since February, waiting for a problem to be resolved, I assume this is due to supply issues?
Mine has taken about five weeks, apparently itās in dealers yard now but I keep chasing them for updates! I went for twin aux so expected it to take a little longer.What sort of problem?...
I was told that they are on a 6 week lead time, but mine is coming from dealer stock somewhere within the network so should have it in a week or so apparently.
Keen to hear of any issues though!
What sort of problem?...
I was told that they are on a 6 week lead time, but mine is coming from dealer stock somewhere within the network so should have it in a week or so apparently.
Keen to hear of any issues though!
Something was mis-aligned during manufacturing. Result being that with a grading bucket fitted, it was 2ā higher one side than the other! Something seriously wrong with a jig somewhere? Story Iāve heard is it wasnāt a one off, a whole batch were the same, so getting a new part to rectify the issue was proving difficult! Guy reckons the boom was twisted somehow, but it could be boom, dipper, kingpost, or even the main frame of the machine! Heās not sure by the sounds of it, all he knows is it was not right and itās been gone since February!
That must be why there pushing tilt hitches so much nowSomething was mis-aligned during manufacturing. Result being that with a grading bucket fitted, it was 2ā higher one side than the other! Something seriously wrong with a jig somewhere? Story Iāve heard is it wasnāt a one off, a whole batch were the same, so getting a new part to rectify the issue was proving difficult! Guy reckons the boom was twisted somehow, but it could be boom, dipper, kingpost, or even the main frame of the machine! Heās not sure by the sounds of it, all he knows is it was not right and itās been gone since February!
I hope youāve improved since sending me a three ton size 9ā bucket for a 1.5t machine, with wonky bosses to boot.
Luckily Iāve just ordered an E27 so I might finally use the f****ng thing.