S
Stroppymonkey
Well-known member
Be okay in America! I had a chat about these a while back. No UK market sadlynot a lot of use as'd probably be well over the 3.5t loaded and deffo over the 1020kgs empty![]()
Be okay in America! I had a chat about these a while back. No UK market sadlynot a lot of use as'd probably be well over the 3.5t loaded and deffo over the 1020kgs empty![]()
This toolbox is great ..Plenty of room for grease gun straps shackles - what's not great it the fact when you wanna get in it for a strap or shackle you need to stop the machine and take key out which is not so good....having a second key somewhere isn't ideal ..for us it needs to simply turn for access and locking not a necessity but can't stick out for obvious reasons.
Can you buy a turning setup that fits flush ? AND DOESN'T NEED A KEY
View attachment 45283
So we've exposed this chamber it is leaking grd water in due to the ground pressure and lack of concrete. There is no base under it so everything is moving.
We are going to take it out install a base. Then thinking of using a concrete 1m high ring with the current chamber inside and concrete the void between the chamber and ring to try and keep costs down.
Anyone see an issue with this.
The concrete pipe is redundant.
Water level is around 100mm above the top of main pipe at present
View attachment 45327
This toolbox is great ..Plenty of room for grease gun straps shackles - what's not great it the fact when you wanna get in it for a strap or shackle you need to stop the machine and take key out which is not so good....having a second key somewhere isn't ideal ..for us it needs to simply turn for access and locking not a necessity but can't stick out for obvious reasons.
Can you buy a turning setup that fits flush ? AND DOESN'T NEED A KEY
View attachment 45283
Best I've come up with is that so far
Yeah its all 40mm stone in that area from whoever did the originalI'm guessing the aim is to not have to concrete the whole excavation ??
Get your hands on some 8mm corrugated plastic sheets, correx/beamform whatever you want to call it, and some 150mm deck chair mesh spacers.Yeah its all 40mm stone in that area from whoever did the original
Yeah its all 40mm stone in that area from whoever did the original
132 I think for the ringI've never had any trouble backfilling simultaneously with concrete and crush. Build concrete up well compacted with a trowel. Then crush put in with trench compactor. And repeat. More time consuming but I doubt it comes close to the cost of a concrete ring.
Permitted development ...le gâchisPerfect job for the 6t
Be à fair thing for the bulk of our work when it gets tilty on.
I like it as much as anything I've driven in a long time, only gripe would be that after the Kubota it View attachment 45362feels like boom ram is 50mm too short but I will no doubt stop noticing that at some point.
Oh and some proper footings on this erm ....extension.View attachment 45360View attachment 45361
I was tempted to slew round and knock it off .... looks like someone backed a welfare unit up to the back door !Permitted development ...le gâchis![]()
That's hardcore just waiting to be usedI was tempted to slew round and knock it off .... looks like someone backed a welfare unit up to the back door !
So we've exposed this chamber it is leaking grd water in due to the ground pressure and lack of concrete. There is no base under it so everything is moving.
We are going to take it out install a base. Then thinking of using a concrete 1m high ring with the current chamber inside and concrete the void between the chamber and ring to try and keep costs down.
Anyone see an issue with this.
The concrete pipe is redundant.
Water level is around 100mm above the top of main pipe at present
View attachment 45327
PastedHow deep is that chamber? Got to be on the limit for maximum depth at that size ring!
Yes im on with it .. got a price off engcon and waiting to hear back from rototilt - kinshofer nox won't supply a tr07 and only the tr11 which is too heavy a lump so that rules that out unfortunately.That's hardcore just waiting to be usedLooks like you've had some decent weather over there, can't remember when i last saw some dry muck!
Do you have a plan for the Tilty?
Would mtk supply you one?Yes im on with it .. got a price off engcon and waiting to hear back from rototilt - kinshofer nox won't supply a tr07 and only the tr11 which is too heavy a lump so that rules that out unfortunately.
Shouldn't be too long though![]()
Yep it's slightly over i think but the client wants to go with this. We've put so many runs right its ridiculous. This was a branch capped off with 2 bricks, other end leading to a downpipe then onto a toilet, all feeding to the old sceptic tankHow deep is that chamber? Got to be on the limit for maximum depth at that size ring!