I am distinctly jealous!!Screener looks good
I am distinctly jealous!!Screener looks good
they're the bollox for sure ... produce a lovely materialScreener looks good
Tidy wallingFunny weather today monumental rain then hot sun then rain, started screening the spoil pile with the new Lloyd screener, soiled up the splay, talked them into a name stone in the wall one of the ones we dug up. Then sprouted a stream from blocked gulley in road.
Apache did a flyover
Well arrived yesterday and another inch of rain over night, ramp dug out and sump in and 600 litres of water pumped out and the remaining section of type1 dug out and mixed cement through and compacted down again, if the weather holds out might get the rest of the type 1 that was delivered down on monday
You boys got some poor quality type 1, provided its a heap more than 7 or 8 ton it's no worse for getting rained on here.It also makes a massive difference if you seal the type 1 piles over every night.
Only needs to run a bucket over it but it makes a massive difference to how usable it is after a week sat there
You boys got some poor quality type 1, provided its a heap more than 7 or 8 ton it's no worse for getting rained on here.
You need moisture for compaction if its bone dry straight of the screener it doesn't bind and when you grade it the fines drop through and you end up with big loose stone on the top. Of the 2 quarries nearest me I'll only use 1 as the other has too much dirt in the type 1 and turns to sh*t when wet. I actually like to get type 1 delivered before I need it of there's room on the job so it gets a shower of rain or 2 on the heap before i use it (hopefully).I don't think it's anything to do with quality as I find all type 1 is better off for being sealed in. And not having quaries anywhere near us we get all sorts of type 1. Can get different types from the same supplier in 1 day.
You need moisture for compaction if its bone dry straight of the screener it doesn't bind and when you grade it the fines drop through and you end up with big loose stone on the top. Of the 2 quarries nearest me I'll only use 1 as the other has too much dirt in the type 1 and turns to sh*t when wet. I actually like to get type 1 delivered before I need it of there's room on the job so it gets a shower of rain or 2 on the heap before i use it (hopefully).
Tbf had some quarried limestone 6f5 on a job once and it came wet through, was useless for a while, regraded it once dry, after it dried once it’s absolutely rock hard!
We Always cap off 6f2/6f5 with road plannings or type1/asphalt!
The only time I use anything less (little petrol) is if it's absolutely pishing it down and ground underneath is soft and ur just trying to knock stones in and leave a smooth top when it dries out.For the 75mm and down what's the minimum size Wacker that would be needed?
Not sure on the savings and too late for this one, but generally use quarried type1 for ease of compaction as the excavations are generally too small or odd shaped to get a small roller in, especially by the time a ramp is made into the area.
I've used a 100kg Wacker on that size stuff with success. If you get it good with the digger before hand the Wacker will still consolidate it.For the 75mm and down what's the minimum size Wacker that would be needed?
Not sure on the savings and too late for this one, but generally use quarried type1 for ease of compaction as the excavations are generally too small or odd shaped to get a small roller in, especially by the time a ramp is made into the area.
Got one myself for areas bigger than can't be arsed to wack but not worth getting 120 roller onto job for. I don't use it enough but tbh by the time you've took the wacker for the edges and corners half the time I just carry on with wacker as ped roller is extra hassle to take to job with you.@JD450A will have a fit- but the bomag pedestrian rollers are handy for this. @ 500kg they are heavier than most Wackers and still light enough to lift in position etc. I don't have a problem with them myself- but everyone else on here seems to think they're the work of the devil![]()
For the 75mm and down what's the minimum size Wacker that would be needed?
Not sure on the savings and too late for this one, but generally use quarried type1 for ease of compaction as the excavations are generally too small or odd shaped to get a small roller in, especially by the time a ramp is made into the area.