The 'Today's Job' thread

Furniss

Furniss

Well-known member
I'm trying to think like that. But I just know that the first time I have to take a day off to replace a pipe or something, I'll be kicking myself for not changing it for £10k!

Even doing the work myself, downtime is still expensive. But I've started down that route now. New tracks and a bucket pin/bush set for the E27 have arrived.

I'm thinking that I might end up being sat around a lot over the next year or so! This won't just be a recession, it's looking like a depression.

When everyone gets through their backlog of work it's going to be interesting.
 
Storrsy

Storrsy

Well-known member
I'm trying to think like that. But I just know that the first time I have to take a day off to replace a pipe or something, I'll be kicking myself for not changing it for £10k!

Even doing the work myself, downtime is still expensive. But I've started down that route now. New tracks and a bucket pin/bush set for the E27 have arrived.

I'm thinking that I might end up being sat around a lot over the next year or so! This won't just be a recession, it's looking like a depression.
I dunno. Many will be sat around perhaps but I reckon if your good at what you do and particularly with your level of diversity there will always be work out there. Might be eating my words in a year's time but I'm feeling optimistic even if some of the fat has to be trimmed.
Maybe I've just been lucky but to me it's almost a given to expect at least 4000 hrs out of a 3 tonner without too much hassle. Maybe a a set of tracks and a few hoses in that but my old 2.8t I sold at 5200 hrs and it needed tracks, hoses and a thermostat in that time. Wasn't on an easy life either I've almost come to expect boring reliability from them now as a result.
 
Furniss

Furniss

Well-known member
I dunno. Many will be sat around perhaps but I reckon if your good at what you do and particularly with your level of diversity there will always be work out there. Might be eating my words in a year's time but I'm feeling optimistic even if some of the fat has to be trimmed.
Maybe I've just been lucky but to me it's almost a given to expect at least 4000 hrs out of a 3 tonner without too much hassle. Maybe a a set of tracks and a few hoses in that but my old 2.8t I sold at 5200 hrs and it needed tracks, hoses and a thermostat in that time. Wasn't on an easy life either I've almost come to expect boring reliability from them now as a result.
I'm a bit the other way re diversity.... we have been very diverse over the years and can go that way again if needed but last 10 years less so - I've said it before that compared to specializing it's fooking hard work trying to do a million and one things, we do water treatment.... got to have it, it's not like a driveway or landscaping etc.
 
doobin

doobin

Well-known member
Scrubs up ok. Wish modern paint was as good!

Off to town whilst she fills to collect a trailer from a job and some beers from a shop
682597BC-5290-4E2E-9F1A-ACE6C0E747A5.jpeg
 
Giles

Giles

Well-known member
Upgraded to 16 ton after yesterdays 1 ton rocks, the rocks fought back and have also x5 them selfs 😭 haha
 

Attachments

  • 01E1BFEF-930C-4543-BD31-9B6473B6801E.jpeg
    01E1BFEF-930C-4543-BD31-9B6473B6801E.jpeg
    433.1 KB · Views: 159
  • AE30A08C-BDF9-4C38-AAAB-F3732C568912.jpeg
    AE30A08C-BDF9-4C38-AAAB-F3732C568912.jpeg
    385.5 KB · Views: 158
  • 5FF9A2B6-DF6F-41B7-9891-3C3CA34CB0E9.jpeg
    5FF9A2B6-DF6F-41B7-9891-3C3CA34CB0E9.jpeg
    435.8 KB · Views: 158
  • 8387BB16-3148-4104-9D41-9C045495BC93.jpeg
    8387BB16-3148-4104-9D41-9C045495BC93.jpeg
    421.9 KB · Views: 154
  • 6D60674B-5A5A-44D9-89A9-E25DC9CC1D16.jpeg
    6D60674B-5A5A-44D9-89A9-E25DC9CC1D16.jpeg
    421.7 KB · Views: 162
  • 972B1599-3AFF-40EB-A057-1032FEEA7682.jpeg
    972B1599-3AFF-40EB-A057-1032FEEA7682.jpeg
    299.4 KB · Views: 130
D

DaveDCB

Well-known member
85B4AF2B-F485-432F-82CA-5A0434E42FD5.jpeg

Started the strip down of my next job(our own building) been delayed 7 months due to bat licence and survey issues.. took two ridge tiles off and out pops a bat! Glad In some respects as I had to pay a guy £540 to come and watch us start the strip down! So at least he kinda did something by putting said bat into a the batbox 🤯 what a money making racket though!!

Ps I didn’t just turn the building upside down and tip everything off it 😂
 
6

6feetdown

Well-known member
View attachment 37570
Started the strip down of my next job(our own building) been delayed 7 months due to bat licence and survey issues.. took two ridge tiles off and out pops a bat! Glad In some respects as I had to pay a guy £540 to come and watch us start the strip down! So at least he kinda did something by putting said bat into a the batbox 🤯 what a money making racket though!!

Ps I didn’t just turn the building upside down and tip everything off it 😂
Makes stripping the roof safer 😄
 
Top