The 'Today's Job' thread

1RB

1RB

Well-known member
Crane fed chippers (at the smaller end of the scale like these) aren’t as good as machine fed IMO - you can’t see what you are doing, they need constant repositioning, you have to stand somewhere (out of harm’s way) to operate them, and they are heavy, expensive one-trick-ponies. But I agree that hand feeding this size machine is a pointless exercise, and concede that moving two machines is obviously double the hassle.

I’m looking at getting a truck (and subsequently developing a Yorkie addiction, honing my prostitute-murdering skills, and shaving 100 off my IQ…) as we do quite a few 1-2 day jobs all over the place. Ideally I’d stick the 6 tonner and a decent sized chipper on the back and be in and out of jobs on my own in a day - this work tends to not warrant stockpiling the arisings for biomass (which we tend to farm out on the bigger clearances) and running in a different way would save a great deal on travel and labour. I’ll probably go down the tracked-chipper route but wanted to see what this unit is capable of - it’s a good match to the 2.7 tonner in fairness, and would do the necessary with the 6 tonner too.
This is what I use & it works well following a roto merlo about. 12x17 inch bandit, 150hp & remote in the digger 👌
 

Attachments

  • E62B65FA-ECF1-4CC2-A775-1F581C1F6E37.jpeg
    E62B65FA-ECF1-4CC2-A775-1F581C1F6E37.jpeg
    185.2 KB · Views: 241
  • 58D3E2AA-EAA8-4E10-8CEA-DED6623B112D.jpeg
    58D3E2AA-EAA8-4E10-8CEA-DED6623B112D.jpeg
    135.5 KB · Views: 195
  • 9FEA4615-EB28-44DF-865E-30755B45F0E5.jpeg
    9FEA4615-EB28-44DF-865E-30755B45F0E5.jpeg
    510.4 KB · Views: 198
doobin

doobin

Well-known member
Two different tools for two different jobs really.
Ask doobin tyou really need 2 of each
For dismantling I don’t think you can beat the roto telehandler, even with a scrap handler.

Specialist work though. I use the loaders for moving stuff out of gardens, but the diggers with grabs are used a lot more.
 
Top