Wanted - Forks for 5-8 ton

Giles

Giles

Well-known member
Bet you had it poured before lunch 😉
It was the sideways rain and the 35mph winds that was ‘the problem coming through 6 big doors and 6 pedestrian doors took 5 hours to sheet them up while the lads got the concrete in. Dangerous with a sail of visqueen in a hurricane but yeah actually concrete was in by 12 not sure what time the finishers got away heading in in a minute See how it came out.

sun out today typically

lads still there finishing it this morning eek long night for them!
 

Attachments

  • 03943010-2D91-4BD6-A910-FA96AF950536.jpeg
    03943010-2D91-4BD6-A910-FA96AF950536.jpeg
    181 KB · Views: 227
Last edited:
Top