Giles
Well-known member
It was the sideways rain and the 35mph winds that was ‘the problem coming through 6 big doors and 6 pedestrian doors took 5 hours to sheet them up while the lads got the concrete in. Dangerous with a sail of visqueen in a hurricane but yeah actually concrete was in by 12 not sure what time the finishers got away heading in in a minute See how it came out.Bet you had it poured before lunch![]()
sun out today typically
lads still there finishing it this morning eek long night for them!
Attachments
Last edited: