tool and a half

Vinpetrol

Vinpetrol

Well-known member
Do I think that that machine is worth the xtra cost over a standard 6t and tilty, no, but it has wide steels, 3 piece boom and xtra flow so they dont come free.
Do I think that it would take 15 years to pay it off in the right work = no
What’s the right work ?
 
Giles

Giles

Well-known member
Im not saying this machine @ 95k is necessarily the best value point bang for buck but I dont think that @Giles you quite get how efficient a machine like this can be on the right sort of price work.......those sums are way out.
You dont buy something like that to work on £45 hourly rate.
2300 hours into 700hrs efficient?

As efficient as you can be and a presumption of continuous work how many extra jobs a year can you fit in?

do you save 1 day a week? 1 day every 2 weeks etc?

Never have slow days where track comes off of dumper fuel filter is clogged or concrete is late or it rains all day etc. Almost a reliance on perfection in scheduling and performance for these much vaunted efficiencies but do they ever turn into hard currency or just let you have more time off with family etc?

Yes definitely makes the machine more efficient and some jobs can be done quicker, (although watching you tube a lot of tilty ops seems to tit around a lot with spiny thing)

Saw a video today of a guy in Lincoln way in a new Volvo 14 ton and rototilt mixing concrete in a pan mixer picking cement bags up spinning 180 degree and ripping them on spike then man stood next to mixer retrieved bag! I’d have just moved the cement pallet next to the mixer and the lad could have thrown 8 bags in in the time it took man in machine with gripper to do one! But it looked good on video.
 
Furniss

Furniss

Well-known member
2300 hours into 700hrs efficient?

As efficient as you can be and a presumption of continuous work how many extra jobs a year can you fit in?

do you save 1 day a week? 1 day every 2 weeks etc?

Never have slow days where track comes off of dumper fuel filter is clogged or concrete is late or it rains all day etc. Almost a reliance on perfection in scheduling and performance for these much vaunted efficiencies but do they ever turn into hard currency or just let you have more time off with family etc?

Yes definitely makes the machine more efficient and some jobs can be done quicker, (although watching you tube a lot of tilty ops seems to tit around a lot with spiny thing)

Saw a video today of a guy in Lincoln way in a new Volvo 14 ton and rototilt mixing concrete in a pan mixer picking cement bags up spinning 180 degree and ripping them on spike then man stood next to mixer retrieved bag! I’d have just moved the cement pallet next to the mixer and the lad could have thrown 8 bags in in the time it took man in machine with gripper to do one! But it looked good on video.
@Giles are you talking about that specific machine or a standard 70k 6t tilty setup in general ?
 
hiluxman

hiluxman

Well-known member
2300 hours into 700hrs efficient?

As efficient as you can be and a presumption of continuous work how many extra jobs a year can you fit in?

do you save 1 day a week? 1 day every 2 weeks etc?

Never have slow days where track comes off of dumper fuel filter is clogged or concrete is late or it rains all day etc. Almost a reliance on perfection in scheduling and performance for these much vaunted efficiencies but do they ever turn into hard currency or just let you have more time off with family etc?

Yes definitely makes the machine more efficient and some jobs can be done quicker, (although watching you tube a lot of tilty ops seems to tit around a lot with spiny thing)

Saw a video today of a guy in Lincoln way in a new Volvo 14 ton and rototilt mixing concrete in a pan mixer picking cement bags up spinning 180 degree and ripping them on spike then man stood next to mixer retrieved bag! I’d have just moved the cement pallet next to the mixer and the lad could have thrown 8 bags in in the time it took man in machine with gripper to do one! But it looked good on video.
That video just popped up on fb, definitely waste of time with the cement bags like that and as you say there's now a bloke stood there doing nowt otherwise.
 
D

DaveDCB

Well-known member
That video just popped up on fb, definitely waste of time with the cement bags like that and as you say there's now a bloke stood there doing nowt otherwise.
Saw the same… drive telehandler closer to the bags…?
They do some amazing jobs so can’t knock them too much!
Altho I’d of not been lazy and clipped the strap onto the lifting eye rather than the gripper 🤦‍♂️ someone is soon going to get poked real hard when putting up lazy ass working methods online!
 
Furniss

Furniss

Well-known member
Saw the same… drive telehandler closer to the bags…?
They do some amazing jobs so can’t knock them too much!
Altho I’d of not been lazy and clipped the strap onto the lifting eye rather than the gripper 🤦‍♂️ someone is soon going to get poked real hard when putting up lazy ass working methods online!
Whats the vid ?
 
K

kato512

Well-known member
EUROCOMACH 65TR DIGGER WITH 3 PIECE FRONT END ENGCON TILTROTATOR AND TOP HITCH. BEST ITALIAN ENGINEERING.
VERY HIGH SPEC MACHINE. 550 WIDE STEELS 90% GOOD. EXTRA 505 KG COUNTER WEIGHT BRINGS IT UP TO ABOUT 7 TONNES WITH OUT ENGCON. FRONT IN ROOF CAB GRILLS. REAR CAMERA. BLUETOOTH RADIO. 4 LEDS TO FRONT 3 TO REAR. AIR CON, REVESABLE FAN. STORAGE AREA FOR FRONT LOWER SCREEN.3 BREAKER LINES & RETURN LINE.
ONE HAS ITS OWN PUMP AT 60L MIN 180 BAR FOR RUNNING FLAILS ETC,IMOBILISER FITTED.KUBOTA ENGINE.
LAST OF EUROCOMACH SOLD INTO UK. PARTS STILL AVALABLE. THESE HAVE BEEN TAKEN OVER BY CASE. AM TOLD NOT AS HIGHER SPEC. THIS IS A VERY POWERFULL MACHINE FOR ITS CLASS VERY IMPRESIVE DIGGING PERFORMANCE.
WILL BE AVALBLE AROUND END OF FEBUARY MAYBE SOONER. WILL HAVE OVER 700 HRS ON CLOCK BY THEN.
TIIS WAS NEW END FEBUARY 2023 PLATED 2022.
ENGCON EC206 COMPLETE WITH TOP HITCH WITH EC OIL TOP AND BOTTOM KNOW NEED TO GET OUT OF CAB TO CHANGE ATTACHMENTS OR CONNECT TILTROTATOR. COMES WITH DETACHABLE GRIPPER. ENGCON WARRANTY END FEBUARY 2025. COMES WITH 3 TOOTHED BUCKETS ON S40 BRACKETS. 18" 24" 30". COMES WITH 1 NEW EC OIL BRACKET.
HAVE 6 MORE CURRANTLY ON ATTACHMENT FOR SALE AT EXTRA COST. 8` GRADEING BEAM ALSO AVALBLE AT EXTRA COST. IF YOU PRESS BUY IT NOW YOU WILL BE SENT A PICTURE.

PRICE IN THE REGION OF £95000 + VAT CLITHEROE AREA. REASON FOR SALE HAVE JUST ORDERED A LARGER MACHINE. CALL ANDY 07968173811 FOR ANY MORE INFO OF OFFERS. 5% NON REFUNDABLE DEPOSIT ON SALE.
s-l1600.jpg
Now on bidspotter ending tomorrow
 
Top