Finished a bollocksy fencing repair job- not my thing but put a silly price on and got it. Evidently nobody else fancied it- every post has been set in concrete so lots of crush whacked in well used to fill the massive holes left when we pulled the rootballs out. Finicky little things like new chicken wire and baseboards round the veg patch. M18 Brad stapler absolutely brilliant here. Rock auger saved the day drilling out the last gateposts.All spread out around an acre, some posts to knock in also, both digger and Multione on site. It was all oak replacements so that trailer of small oak butts from the other day was just the ticket- love it when things line up. Only one photo as it’s just not interesting and I was too busy most days to take any!
£5750, four and a half days on site (soaking wet on the ground, bloke also wanted it done in a specific two week period). Subby labour and bought in materials under £2k, maybe £800 worth of oak posts if I hadn’t cut them myself. A job that used all my skills and tools but for reasonable profit.
As we finished in the morning and I already had the E19 with grab with us I took the opportunity to have Jordan help me on a little site clearance job. Not bad for an afternoons work with two of us and nor was the money. Very handy having him bring the truck alongside as the road was very narrow and it would have been a major ballache doing it all myself.
Bit tight getting in but I don’t mind scratching an older digger. Probably underpriced it at £1050 but I couldn’t really see just how large it was when I first looked, the brambles were epic. Painful compared to the e27 but needs must. Started at 1, all rubbish away by 5. Popped back the next morning to level it off with the bucket and take a small load of scrap away/collect the digger.