V8Druid
do it as well as you can,but learn to do it better
well that's certainly not dear for that, based on previous discussions
well that's certainly not dear for that, based on previous discussions
Molsons rep didn't sayAny way to get it up there on the train or was/is it just being tracked all the way?
have you recovered from paying for the slabs yet?i am the customer
View attachment 41855another 2 sides of the house to go
So did mine ! I couldn’t have looked at that forever more without it driving me mad . I didn’t have the cheek though to be the first to put the boot into bobs hard workAhhhhhhhhhhhhhh
My ocd just exploded on those joint lines not meeting
I’d have laid a 600mm full width strip on the 45 angle to hide that transition
It caught my eye tooSo did mine ! I couldn’t have looked at that forever more without it driving me mad . I didn’t have the cheek though to be the first to put the boot into bobs hard work![]()
How long do you reckon before bob redoes itIt caught my eye toowe're all at it now
![]()
I don’t have OCD but it hurt my eyes. My reaction was WTF!!Ahhhhhhhhhhhhhh
My ocd just exploded on those joint lines not meeting
I’d have laid a 600mm full width strip on the 45 angle to hide that transition
Glad I'm not the only one that instantly thought that.Ahhhhhhhhhhhhhh
My ocd just exploded on those joint lines not meeting
I’d have laid a 600mm full width strip on the 45 angle to hide that transition
That’s 1 in 5800 if hes working to that kind of accuracy he’s well worth keeping hold offGlad I'm not the only one that instantly thought that.
Today we were been critical over losing 10mm on a 58m run of 600x600 concrete flags. I had to say to lad, don't worry about it. Hence why I've found this lad 3 years solid work but others don't even get to 3rd day.
Is it not worth tapping a board down side so can flood to end of path ? Asking for BobOn the subject of paving we’ve just pointed all this up with flow point liquid screed, very happy with it and now will be our go to.
Proper cement joints not like the sand resin polymerics that go green and then can pop out. Setts eat it up at £15 a bag getting about 1.5m2 per bag but we had to Match existing which had huge joints.
No we just use the thicker bit out the bucket when it’s started to set up a bit, have a bit of time going rd doing edgesIs it not worth tapping a board down side so can flood to end of path ? Asking for Bob
View attachment 41873
8 grandhave you recovered from paying for the slabs yet?![]()
shocking ain't they .... mine were bad enough two years ago ...... are yours 20 or 40mm thick ?8 grand
20mm brushedshocking ain't they .... mine were bad enough two years ago ...... are yours 20 or 40mm thick ?
Mandarin / Black Mountain / ?20mm brushed
He is, he's annoyingly accurate sometimes and takes too long but I'd rather that than him knock days or just say fcuk it, it'll be right.That’s 1 in 5800 if hes working to that kind of accuracy he’s well worth keeping hold off