D
DaveDCB
Well-known member
Maroon maybe then.. I was pretty much blind the next day
I'm pretty sure you're mistaken here. Rocks that size can't just be piped via an auger into the hold. And you'd never get a cargo ship close enough to unload. They use flat bottomed barges that can be shunted in when tides allow.They kill two birds with one stone (pardon the pun!) Cargo ships require vast amounts of ballast in the hull which is where the rocks come in
And that truly is worthy of the "that's not going anywhere" leaning on the shovel remarkLast shutters done for the timber frameView attachment 37487View attachment 37488
And that truly is worthy of the "that's not going anywhere" leaning on the shovel remark![]()
Liability for structural engineersAlthough with all the green policy's at the moment you have to question why we are tipping hundreds of thousands of tonnes of concrete into the ground when there are hundreds of houses that have last a few century's built on top of flagstones laid in the mud.
It’s gonna sink due to the weight of all the bloody concreteLiability for structural engineers
Liability for structural engineers
Turns out Western Power gave us the wrong size hockey stick so may have to core through the toe now for a bigger ductIt’s gonna sink due to the weight of all the bloody concrete![]()
you mean they might have toTurns out Western Power gave us the wrong size hockey stick so may have to core through the toe now for a bigger duct![]()
How about they come and do it! What did they send a 32mm? Single phase?Turns out Western Power gave us the wrong size hockey stick so may have to core through the toe now for a bigger duct![]()
How about they come and do it! What did they send a 32mm? Single phase?
100mm then,had this on present job ,put a 3 phase supply in as standard now ,car chargers ,ashp etcYeach should have been 3 phase apparently
3ph Seriously? Or do you need advise of expecting demand?100mm then,had this on present job ,put a 3 phase supply in as standard now ,car chargers ,ashp etc
Any need for it? Just a bigger bill for the end user otherwise.. we’ve built some pretty big houses and none needed over 100a.. even my industrial unit is only 1phYeach should have been 3 phase apparently
I'll double check tomorrow but I'm sure that's what they said, unless I'm getting cross wired excuse the pun as I know the new transformer they put up last week was 3 phase. Still the duct is definitely wrong size3ph Seriously? Or do you need advise of expecting demand?
That's ruddy handy for folk who just may require "moderately sized machinery for their hobby"![]()
All mains feeds are 3ph hv that we have put in, then the last 30meters are single ph LV, all future proofing the main runs which makes sense, obviously having the final ducting in to take 3ph is handy,… but not when you have the world’s strongest foundations to go throughI'll double check tomorrow but I'm sure that's what they said, unless I'm getting cross wired excuse the pun as I know the new transformer they put up last week was 3 phase. Still the duct is definitely wrong size