The 'Today's Job' thread

doobin

doobin

Well-known member
Alot of UK places won't let you collect in less than a 7.5t even if you wanted to
Nearest place must be fifteen miles away, and weight is a killer- the water weight you don’t think about when it comes out of the tap! 🤣 Plus I wouldn’t like to transport a wet ish mix in my trailer with the sides.

All our work is within five miles of base generally speaking, and I have sharp sand and shingle in 20t bays at the yard. I always used to use volumetric trucks, but recently the prices have gotten sky high plus extra charges for the ‘empty’ tonnage. This works out similar money I reckon once accounting for labour, but you have complete control over timing etc. today was around four cube. New mixer is a big step up.

I wanted a tub mixer (could load with Sherpa etc on larger jobs and move with the multione if room) but I don’t have enough hydraulic flow to run a small one properly unless the 2.7t or big loader are there, which of course they often are not. So for £800 this seemed a good stopgap to test the water.
 
S

Smiffy

Well-known member
Nearest place must be fifteen miles away, and weight is a killer- the water weight you don’t think about when it comes out of the tap! 🤣 Plus I wouldn’t like to transport a wet ish mix in my trailer with the sides.

All our work is within five miles of base generally speaking, and I have sharp sand and shingle in 20t bays at the yard. I always used to use volumetric trucks, but recently the prices have gotten sky high plus extra charges for the ‘empty’ tonnage. This works out similar money I reckon once accounting for labour, but you have complete control over timing etc. today was around four cube. New mixer is a big step up.

I wanted a tub mixer (could load with Sherpa etc on larger jobs and move with the multione if room) but I don’t have enough hydraulic flow to run a small one properly unless the 2.7t or big loader are there, which of course they often are not. So for £800 this seemed a good stopgap to test the water.

Wouldn't you just leave a pan mixer in the yard. Can even stay on a stand that trailers and vehicles can be reversed under. Perfect for doing kerbs sandbags or other jobs requiring drier mixes. Or just wet up on site jor bigger jobs.
 
Furniss

Furniss

Well-known member
weight isn't an issue for me but we hand mixed for years and more recently we just pick up dry curb mix from plant and wet it up in tracked mixer if need be, but we never really need wet gear nowadays
But you have plenty of laborers 😉
 
Storrsy

Storrsy

Well-known member

Nearest place must be fifteen miles away, and weight is a killer- the water weight you don’t think about when it comes out of the tap! 🤣 Plus I wouldn’t like to transport a wet ish mix in my trailer with the sides.

All our work is within five miles of base generally speaking, and I have sharp sand and shingle in 20t bays at the yard. I always used to use volumetric trucks, but recently the prices have gotten sky high plus extra charges for the ‘empty’ tonnage. This works out similar money I reckon once accounting for labour, but you have complete control over timing etc. today was around four cube. New mixer is a big step up.

I wanted a tub mixer (could load with Sherpa etc on larger jobs and move with the multione if room) but I don’t have enough hydraulic flow to run a small one properly unless the 2.7t or big loader are there, which of course they often are not. So for £800 this seemed a good stopgap to test the water.
Interesting.
I might have a job coming up. No lorry access and concrete has to go down a narrow pathway for 500 meters to bed in granite kerbs and form runoff gullies. Was wondering the easiest way to do it. Thinking digger buckets into 2 ton dumper at roadside and mix it in the dumper with the digger before taking it down the path.
 
doobin

doobin

Well-known member
Wouldn't you just leave a pan mixer in the yard. Can even stay on a stand that trailers and vehicles can be reversed under. Perfect for doing kerbs sandbags or other jobs requiring drier mixes. Or just wet up on site jor bigger jobs.
That’s really not a bad idea. Just not sure how you’d ‘wet it up on site’?
 
Shovelhands

Shovelhands

Well-known member
That’s really not a bad idea. Just not sure how you’d ‘wet it up on site’?

What about if you made yourself a small mixer bucket for the Sherpa? Chuck it in the bucket as a dry mix, batched from the pan, stick a drop of water with it and mix it as you trundle from the trailer to the point of use?
 
doobin

doobin

Well-known member
What about if you made yourself a small mixer bucket for the Sherpa? Chuck it in the bucket as a dry mix, batched from the pan, stick a drop of water with it and mix it as you trundle from the trailer to the point of use?
You’d never get the water perfect. Extra weight of the mixer bucket would mean you’d be moving much less. And it wouldn’t move whilst mixing.

Small gear is great, but there are limits unfortunately.
 
S

Smiffy

Well-known member
That’s really not a bad idea. Just not sure how you’d ‘wet it up on site’?

I either mix it on the floor or in the back of the lorry with a machine.

Have it damp enough to set out the pan mixer. Kind of damp enough to roll into a ball. Which doesn't equate to much water weight. Then it's really just wetting it up for workability so getting the water right isn't so much of a problem as the mix is already wet enough.

Or the school of African engineering. Throw it all in and use the Rotavator.
 
R

Russell

Well-known member
I got some made up and stuck in the dumper on the trailer the other day. Was nice to not have to take the mixer.
Instead of mixing it myself, just sit in the car for 10 min.
If I had a few more jobs like that it would be worth getting a bigger dumper.
 
6

6feetdown

Well-known member
20220608_160509.jpg
20220608_210418.jpg

Internal shutters stripped this afternoon
 
Giles

Giles

Well-known member
Yup. Looks exactly the same as the belle road tow, I know a lot of their stuff comes from the continent.

Which pan mixer do you have?
I’ve got the imer 240 litre great mixer for lime mortars, has jack on it to jack it up then drop legs, little Honda engine etc

I had same problem with flow for pan mixer power pack or 1.5 ton wouldbt power it only 3 ton + etc
 

Attachments

  • A6795DB5-1675-4C49-BCA3-AB1C198D4270.jpeg
    A6795DB5-1675-4C49-BCA3-AB1C198D4270.jpeg
    183.3 KB · Views: 131
  • 9EF995F4-9158-422B-86E5-B7C61CAD1DBE.jpeg
    9EF995F4-9158-422B-86E5-B7C61CAD1DBE.jpeg
    51.6 KB · Views: 132
GazCro

GazCro

Well-known member
I’ve got the imer 240 litre great mixer for lime mortars, has jack on it to jack it up then drop legs, little Honda engine etc

I had same problem with flow for pan mixer power pack or 1.5 ton wouldbt power it only 3 ton + etc
I'd bet you'd be surprised how much flow a hyd pan mixer would need gotta be careful if you're only meeting min required.
 
Top