tarmac prices

M

mart1602

Well-known member
evening lads,anyone on here do tarmac that can give me a rough guide on a 2.5m wide x 150m long lane its my own property not a job and would be prepped ready so a ball park figure of what the cost to supply and lay.many thanks
 
GazCro

GazCro

Well-known member
Be a machine lay job at that (provided it fits) round me I'd expect around £25m2 for 100mm in two layers. Not had any priced for a while so can't be specific. I guess it depends how far from tar plant you are a well I'm only 20mins away so haulage cost is minimal.
 
M

mart1602

Well-known member
yes machine lay job im 18 mile from the plant ,from those 2 prices i think its gonna cost a lorra bucks
 
GazCro

GazCro

Well-known member
Ain't a cheap job but it's worth doing right if you are doing it. It's easy to save by having it thinner but in 10 years time you'd regret it.
 
M

mart1602

Well-known member
bit of gov grant money would have helped but im not eligable after 32 yrs in buisness ffs,thanks guys i was figuring on around 15k
 
S

Smiffy

Well-known member
Have you thought about using a company like kwr contracting or re-drive
They run a ground engaging crusher down the track and simultaneously inject cement to give you a flat level concrete surface at a fraction of the cost
Providing you already have a lot of hardcore in the track\drive they can make a very good job they did an entire yard one place I worked so basically went from hardstanding to concrete overnight
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Have you thought about using a company like kwr contracting or re-drive
They run a ground engaging crusher down the track and simultaneously inject cement to give you a flat level concrete surface at a fraction of the cost
Providing you already have a lot of hardcore in the track\drive they can make a very good job they did an entire yard one place I worked so basically went from hardstanding to concrete overnight
I've watched a few vid.s on that gear and it looks awesome .... IIRC someone on the old forum had a dose done and was well impressed .... might be an option worth exploring @mart1602
 
M

mart1602

Well-known member
mate did it ,was expensive and not very good broke up quickly and only realy 2.5 inches of conc on the top.conc is another option but blocks access for a few days
 
GazCro

GazCro

Well-known member
mate did it ,was expensive and not very good broke up quickly and only realy 2.5 inches of conc on the top.conc is another option but blocks access for a few days
I've looked into this myself for track at home/yard. Can do all conc myself and just for the concrete is half the tarmac cost. Add on mesh and then own time doing it along with access disturbance (do have another way in) and tarmac is a no brainer imo. Years down the line if top wears off conc its a lot of work to sort whereas tarmac could be planed off and topped again.
 
S

Smiffy

Well-known member
mate did it ,was expensive and not very good broke up quickly and only realy 2.5 inches of conc on the top.conc is another option but blocks access for a few days


I think it depends on who does it as the setups vary alot I would think those running 400+hp setups will be able to run deeper than those running 180hp setups
Also will depend on whats there to begin with my bosses yard was good quality hardcore 18inches deep
Although the website says it work on tracks with a high soil content im not sure I'd believe it
 
doobin

doobin

Well-known member
They did a bit here on a prety good flinty/chalk track and it's worked well, held up for around ten years but starting to crack at the edges now. Was KM Goulding I think.
 
M

mart1602

Well-known member
im not sure how far down the cement went into the gravel but the wet conc skin on top is only 2.5 inches ,when it starts to break up and pot hole its worse than just hardcore because you got realy hard edges to the holes
 
D

DaveDCB

Well-known member
mate did it ,was expensive and not very good broke up quickly and only realy 2.5 inches of conc on the top.conc is another option but blocks access for a few days

tempted to start The concrete Road into my yard, same problem as it blocks access off and I ain’t pouring that kinda length in one hit either!!
 
D

DaveDCB

Well-known member
What about concrete sleepers Dave, make a good track
Did consider it, they work out at about 6k for the sleepers or 7k for concrete, both obviously require laying at that.. if I hadn’t already put 250mm of stone down I think I’d go with sleepers 👍🏼
 