Now then, I’m going to show my incredible ignorance here!!!
I’m a lowly tree cutter with next to no groundworks knowledge or experience...
I need to set out some footings (hold-down bolt boxes) for a new steel framed shed. Each one needs to be 1m x 1m x 600mm deep (this is 300mm below finished floor level) and are going in ground that has been stripped and stoned up (but I’ve left rough gaps in the stoning up where the footings need to go). There will need to be further excavation in the footings holes to get the 600mm depth - the hole bottoms are still virgin undug ground if that makes sense?
I’d like to do a tidy job/do it properly but obviously anything underground can’t/won’t be seen. Should I overdig and essentially shutter the full 600mm depth or is it acceptable to get the holes about right/square and just shutter the top 6 or so inches?
(Just to be clear, I’m not nicking work off proper builders and pretending to a customer that I know what I’m doing - this shed is for me and I’m very aware how clueless I am!)
I’m a lowly tree cutter with next to no groundworks knowledge or experience...
I need to set out some footings (hold-down bolt boxes) for a new steel framed shed. Each one needs to be 1m x 1m x 600mm deep (this is 300mm below finished floor level) and are going in ground that has been stripped and stoned up (but I’ve left rough gaps in the stoning up where the footings need to go). There will need to be further excavation in the footings holes to get the 600mm depth - the hole bottoms are still virgin undug ground if that makes sense?
I’d like to do a tidy job/do it properly but obviously anything underground can’t/won’t be seen. Should I overdig and essentially shutter the full 600mm depth or is it acceptable to get the holes about right/square and just shutter the top 6 or so inches?
(Just to be clear, I’m not nicking work off proper builders and pretending to a customer that I know what I’m doing - this shed is for me and I’m very aware how clueless I am!)