D
Digger126
New member
When building a manhole, who prefers to put there stumps in first and build the manhole and put the laser in pipe later, or do you start by putting laser on a block
Always build the manhole, check the stubs as could be soffit to soffit in change in diameter then set grade as I rarely see a drawing with correct gradients between manholes.When building a manhole, who prefers to put there stumps in first and build the manhole and put the laser in pipe later, or do you start by putting laser on a block