GazCro
Well-known member
There'll be loads how long had the advice been to use membrane over the insulation cos every job before then won't have it.I’ve been told to put a slip membrane, basically thin plastic sheeting, over the insulation before clipping the pipes down. Due to the screed eating the foil on the board.
But there must be lots of places laid without it!