S
Smiffy
Well-known member
Is the problem contaminants or soil stability ??
My old boss put an enormous straw shed up on built up ground and all they did was ask for footings to be doubled so ended up with nearly 4 cube of concrete under each stauntion
This was without a concrete floor
My old boss put an enormous straw shed up on built up ground and all they did was ask for footings to be doubled so ended up with nearly 4 cube of concrete under each stauntion
This was without a concrete floor