Micro Digger Productivity

F

fred

Well-known member
Helped a friend out the weekend, dig and stone up patio and due to access had to get the micro hired in. It's a couple years since last I used one but its really impressive just how much ground you can shift with one in a morning for a pint of red.

It was an old kubota on levers but still had a bit of go in her. Can lift it on the back of the daily with the hiab also so no faffing about with a trainer.

I'd love to have one in the shed just for weeding the runner beans with a rake attachment, may have to get one ordered....
 
B

Brendan

Well-known member
Helped a friend out the weekend, dig and stone up patio and due to access had to get the micro hired in. It's a couple years since last I used one but its really impressive just how much ground you can shift with one in a morning for a pint of red.

It was an old kubota on levers but still had a bit of go in her. Can lift it on the back of the daily with the hiab also so no faffing about with a trainer.

I'd love to have one in the shed just for weeding the runner beans with a rake attachment, may have to get one ordered....
Depending on whats been done and how it's been moved, you can shift some decent amounts. With the two track dumpers going and large area to dig out have shifted 2 full grab loads but does depend on what's been dug and how far to tip. Generally average a full grab a day doing footings at around 1-1.5m deep
 
F

fred

Well-known member
i did immediately miss not having a grading beam though, if i was in that game id defo have a little 5 foot one made for it to stick the laser on.
 
R

Russell

Well-known member
I did a job the other day and got around 20 ton out in 7-8 hours with my e10 and tcp dumper. Access was 800mm wide.
Im impressed with the way it handles a 600 bucket, I though it would struggle but it handles it fine.
I keep dreaming about getting something bigger but a good 50% of my jobs have access of 800mm or less so I cant see a 2-3 ton ever paying for itself, plus it would mean another trip to bring the dumper.
 
hiluxman

hiluxman

Well-known member
I did a job the other day and got around 20 ton out in 7-8 hours with my e10 and tcp dumper. Access was 800mm wide.
Im impressed with the way it handles a 600 bucket, I though it would struggle but it handles it fine.
I keep dreaming about getting something bigger but a good 50% of my jobs have access of 800mm or less so I cant see a 2-3 ton ever paying for itself, plus it would mean another trip to bring the dumper.
Is that you operating both machines
 
B

Brendan

Well-known member
Is that you operating both machines
I can manage that on my own running the tracked dumper myself, but does speed it quite a bit having a second person. More for the bit of time you gain being able to tidy bits up/check levels/relocate
 
B

Brendan

Well-known member
i did immediately miss not having a grading beam though, if i was in that game id defo have a little 5 foot one made for it to stick the laser on.
It's something I have been wanting to get, would it be something you could use an I beam and weld some pins on or do you think would need to be the proper setup with roller type?
 
F

fred

Well-known member
It's something I have been wanting to get, would it be something you could use an I beam and weld some pins on or do you think would need to be the proper setup with roller type?

id use the smallest rsj could get. Rob Walsh at BMC would knock it up for sure.
 
hiluxman

hiluxman

Well-known member
yes I think the arm rest hinge will be the first thing to wear out on the e10.
They are prity strong.

We can do 2 8 wheel grabs in a day with micro and 2 barrows. I find the track dumpers abit too slow.
 
R

Russell

Well-known member
I thought the 008 was a bit rubbish. It surprised me when it tried to tip over after I pushed a bit of muck about in a skip. Also it doesn't multi task as well as the e10.
I have yet to use a wheeled dumper with the e10 . The ones I have seen look to have a small skip.
I like the look of the diesel slanetrack . Apparently its 300 odd litres/ 1 ton payload skip but its 750mm wide and about £12,000+ so i stuck with the tcp
 
Last edited:
Gunners

Gunners

Well-known member
I thought the 008 was a bit rubbish. It surprised me when it tried to tip over after I pushed a bit of muck about in a skip. Also it doesn't multi task as well as the e10.
I have yet to use a wheeled dumper with the e10 . The ones I have seen look to have a small skip.
I like the look of the diesel slanetrack . Apparently its 300 odd litres/ 1 ton payload skip but its 750mm wide and about £12,000+ so i stuck with the tcp
The slanetrack isnt a bad barrow but eats tracks every 300hrs and isnt very refined to control - which is a real issue when navigating it through tight spaces. Cant complain on its power though, it will sprag on the spot with a full load on tickover no problem.
 
Gunners

Gunners

Well-known member
Curtesy of Mr Kitchen, This U10 is very nice
 

Attachments

  • 47dc15be-ed84-4b9a-9276-ffb4a1548ffc.jpg
    47dc15be-ed84-4b9a-9276-ffb4a1548ffc.jpg
    214.3 KB · Views: 271
F

fred

Well-known member
Curtesy of Mr Kitchen, This U10 is very nice

i do like that.....

What is it they done with the levers ? zonked some extenders on the top of them ?

Surprised they haven't added a plastic fillable/demountable counterweight on it to balance the tilty.
 
Top