Sounds like he’s got plenty of room to work, so that’s in favour of a 3CX. Once you get into moving material about, why have two machines when one will do the lot? I had all Friday moving fill and jumping between a 7 tonne dumper and 239 CTL, and it gets monotonous jumping from one to the other. Over the same distance I could have done the job a lot faster on my own with an old black cab 3CX. Take your point about planning, but you need to do that anyway to get anything done.
best thing is to look at all the elements of the job and weigh up the best way to tackle each bit, it’ll soon be obvious which is going to be best buy. Is there a lot of material To shift and stockpile? Front bucket. Trees to knock down and shift? Again a 4in 1 is excellent, and far safer than pulling trees towards yourself with a 360. Big area to grade And stone up? You can do it with a 360 but you can do it a hell of a lot faster with a front bucket. You’ve got the forks on the front bucket for pallets and timber. Big area to excavate? Once you get the hang of the arse end a 3CX with extra dig will take as big a bucket as a 5 - 6 tonnes and have more reach. And no, I haven’t got one to sell. I’m almost talking myself into buying one.
anyway, I love these discussions, everyone’s mileage varies.