wee_gus
Well-known member
Evening all,
need some help with new workshop.
I want to concrete the outside of the workshop so it’s tidier.
It’s 16mtr length x 11mtr width.
at the moment water runs down towards the workshop doors and the runs to the left where you can see another unit.
what’s the best plans for this?
I was going to dig down 200mm
Remove all slop, 50mm hardcore and ramp down, aqua drain running full length of workshop with a fall going to the left as per existing drain. Then 4 bays of concrete
need some help with new workshop.
I want to concrete the outside of the workshop so it’s tidier.
It’s 16mtr length x 11mtr width.
at the moment water runs down towards the workshop doors and the runs to the left where you can see another unit.
what’s the best plans for this?
I was going to dig down 200mm
Remove all slop, 50mm hardcore and ramp down, aqua drain running full length of workshop with a fall going to the left as per existing drain. Then 4 bays of concrete