E
evanstrev
New member
Having discussions at work about the use of back drop pipe set ups! Whilst I will always try to lay pipes to the min/max gradients with the use of back drops to overcome large falls, another lad who hates back drops tells us to just lay long runs of pipe from A to B irrespective of gradient! Who's right and according to building regs, what is the correct way to overcome large gradients?