Stroppymonkey
Well-known member
When you first test plastic you need to stretch it a bit with higher pressure then drop pressure back and let it settle before measuring it.Thanks for reply , yes he is a reputable heat pump guy. He has taken the sap calcs and house plans to work out the heat loss . It needs a 13kw pump . I’ve done a few installs over the years and he’s the most reputable . I’m fortunate that he lives just around the corner now as well ! I’ve left all the joints exposed but didn’t have the luxury of leaving the pipe exposed . I had to do one loop at a time and some of the trenches were so wet I needed to backfill (carefully) at the time before the trench fell in . I’m very confident that the pipework is good as I had a man in the trench checking as I back filled it .
He has a big commissioning pump . A very impressive set up . It’s a large submersible fixed to a frame inside a big wheelie bin . Seems from the advice that I need to get him back with pump and leave it running longer as the issue is likely trapped air