I know that when I dig a trench for a cable its always done so that the armoured cable is 600mm below grade.
What do the regs say? Reason I'm asking is there's a cable in a garden I'm landscaping, installed in between quotation and starting the job, that's 230mm deep and is stopping me from what I need to do, installing linear slot drain. It's armoured cable and in a conduit that has been filled with foam. PITA!
What do the regs say? Reason I'm asking is there's a cable in a garden I'm landscaping, installed in between quotation and starting the job, that's 230mm deep and is stopping me from what I need to do, installing linear slot drain. It's armoured cable and in a conduit that has been filled with foam. PITA!