Not today's job, but one from last week.
Something different....
IMG_20220129_142341_HDR.jpg
 
Last edited:
Left hooker

Left hooker

Well-known member
Finished off on the campsite after being there for 3 months with a large crate soakaway
3.4m deep hole crates stacked up to 2.4 high by 2.4m long by 1.2m wide
Wasn't getting down there so leveled off 32mm clean with digger and laser checked
We built the compleat sack up on the ground and lowered in bottom row was double clipped top and bottom with rope tied to bottom row and fed up through each layer worked a treat

IMG_20220207_163127.jpg


IMG_20220207_163056.jpg
 
M

Monkeybusiness

Well-known member
Finished off on the campsite after being there for 3 months with a large crate soakaway
3.4m deep hole crates stacked up to 2.4 high by 2.4m long by 1.2m wide
Wasn't getting down there so leveled off 32mm clean with digger and laser checked
We built the compleat sack up on the ground and lowered in bottom row was double clipped top and bottom with rope tied to bottom row and fed up through each layer worked a treat

View attachment 32062

View attachment 32063
Not something I know anything about (nice square hole though!) - don’t they need wrapping before backfilling though?
 
Routy56

Routy56

Well-known member
Finished off on the campsite after being there for 3 months with a large crate soakaway
3.4m deep hole crates stacked up to 2.4 high by 2.4m long by 1.2m wide
Wasn't getting down there so leveled off 32mm clean with digger and laser checked
We built the compleat sack up on the ground and lowered in bottom row was double clipped top and bottom with rope tied to bottom row and fed up through each layer worked a treat

View attachment 32062

View attachment 32063
Nice job (y)
Exactly what I do on a smaller scale. Except I gift-wrap the sides before dropping it in the hole.
Then remove the ropes from the big hook and cover the top in geo 🤠
 
F

fred

Well-known member
Finished off on the campsite after being there for 3 months with a large crate soakaway
3.4m deep hole crates stacked up to 2.4 high by 2.4m long by 1.2m wide
Wasn't getting down there so leveled off 32mm clean with digger and laser checked
We built the compleat sack up on the ground and lowered in bottom row was double clipped top and bottom with rope tied to bottom row and fed up through each layer worked a treat

View attachment 32062

View attachment 32063

are you not meant to wrap this with membrane prior to lowering in ?

BC allways insist on it to stop them filling up with mud/pea gravel.
 
Left hooker

Left hooker

Well-known member
are you not meant to wrap this with membrane prior to lowering in ?

BC allways insist on it to stop them filling up with mud/pea gravel.
Was wrapped over top and down sides bottom don't need it as crates sat on 32mm clean stone then filled around with clean stone and just over top another sheet put over whole hole to stop dirt getting into clean stone that I back filled with after
 
F

fred

Well-known member
how you find the zaxis ? The odd occasion we got a hitachi as a hire dropped off I am allways impressed. They seem to have a little bit more power/lift than the other 5 tonners.
 