Working in deep trenches.

BertB.

BertB.

Active member
In years past I've worked in sewer and water operations some of our excavations reached over 10 metres deep installing large diameter storm and sanitary sewers for new housing and industrial developments and expanding trunk lines that fed in to sewage treatment plants. But with most of those jobs those excavations were 'vee'd out with nearly 45 degree slopes and sometimes more if the soil wasn't as stable as the engineers would like. But I also worked on some jobs in built up area's where the crew I was working with was replacing water mains or even doing new service hook ups but anytime we worked on jobs like that it was with some sort of shoring. When I worked on the water line renewal crews we were usually anywhere from 8 feet to around 12 feet deep and the trench was seldom more than 3 or 4 feet deep unless we had a coring machine pit where the old pipe was pushed out and new pipe pushed in, thus minimizing how much excavation had to be done. But often the shoring was simple to place consisting of plywood sheets with a 2"x6" nailed across the center and a gas actuated strut would spread across and be pinned in while the pipe was replaced. If the trench had to stay open for a few days whalers were put in which were long 4"x6" timbers placed lengthwise helping brace those boards.
Then there have been jobs like this one a couple years ago where the company I was working for was attempting to install a sanitary sewer line in unfamiliar ground condtions that consisted of cobble like gravel sitting on a hard layer of heavy clay with a lot of ground water, they had been warned about the ground water and there had been room on the tender to hire out a dewatering company to set up sand points but they thumbed their nose at it just to bid low as possible and get the job as they were pretty much desperate for work.
20160519_114955.jpg
20160519_125540.jpg
20160519_133039.jpg
20160519_145224.jpg
20160525_112447.jpg
20160525_130146.jpg
20160526_084716.jpg
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
our leccy pole got changed last year, beside our drive ..... guys turned up with a 4CX ... op was good with it ..... dug a hole for the new pole, must've been 12+feet deep, One of their guys was in the bloody thing clearing a few inches out the bottom to sit the pole as they wanted it.
Not enough money in the world to have gotten me in the bottom of that hole :oops::oops:

found that pic tonight :oops:
WP_20160601_14_08_26_Pro.jpg


pure insanity :eek:
 
Exmayor

Exmayor

Member
The Rings are not part of the job, they are there as the support for the guy in the hole and after the duct box was finished I lifted the rings out. Approx 1.75 metres deep and massively over dug as you can see from the photo but that's what Costains wanted and that's what they got. It took an extra couple of hours at the max and everyone went home as the moto says
 

Attachments

  • 165 (2).jpg
    165 (2).jpg
    288.1 KB · Views: 322
V8Druid

V8Druid

do it as well as you can,but learn to do it better
think I put that up in CEF a while back ..... :rolleyes:
with all the 'officialdom' present, they're obviously only expecting to recover bodies, :( after the time it will have taken for that bunch of 'suits' to arrive and assemble :unsure: ..... the guy down beside the bucket needed his head feeling, to be in that position, apart from all the other idiots standing around arm waving.!! an un-necessary further loss of life :mad:
Life is cheap out there ... sadly! :(:(
 
BertB.

BertB.

Active member
We had some laterals to install and because the guys were having so many problems with getting the mainline in the deep section, management who really knew nothing about sewer and water work decided to start on one of the laterals and because of the some nearby powerlines we couldn't 'V' out the trench so they had to rent some shoring. In years past most sewer and water companies would build their own but with all the new regulations those cages have been banned this one took most of the morning to assemble and then to use it wasn't easy either as normally the mainline excavator would pull on a chain attached to the cage to advance it in the trench but it kept wanting to dig in and was quite heavy even for this 450 lift.
20160531_135642.jpg
20160601_073026.jpg
20160601_085910.jpg
 
BertB.

BertB.

Active member
Looks like very consolidated soil not a lot of that here until you get in to the escarpment area's and some of the eskers. Another unsafe excavation about 14 or 15 feet deep I can't remember and close to a river. The guys were hooking up a storm drain to an outfall that dumped in to the river but they weren't given the correct shoring instead they had a cage that blocked off some access to the pipes so the backhoe had to hover it above the pipes while the guys tried to tie in to it. They got it done in the end and nobody died or got hurt but its only a matter of time till somebody does.
IMG_1400.JPG
IMG_1401.JPG
IMG_1402.JPG
IMG_1403.JPG
IMG_1404.JPG
IMG_1405.JPG
IMG_1407.JPG
IMG_1408.JPG
 
Top