plant shortages

doobin

doobin

Well-known member
Crazy isn’t it! Expect thefts to rise accordingly, and hire rates too. Insurance might pay out but you won’t be able to replace 🙄
 
S

Smiffy

Well-known member
I Can understand there is alot of companies with covid cash that are trying to spend it before it's taken away
And that some small firms will be buying a machine for the first time
Coupled with the decrease in production for several months will cause a slight shortage

But how can gearing up for the government schemes really cause that much of a demand in machines
What happened to all the existing machines
And who is going to drive these extra machines
If it's that bad surely some of the cpcs hero's will have to suck it up and drive a machine with more than 10 hrs
Or maybe the big sites can make do without lines of machines parked up doing FA
Is this really a problem or are machines the new toilet roll
 
Regy53

Regy53

I like cake
However I can tell you with conviction. There is a huge shortage of kit , hs2 is about to go mental which will take the big boys over there leaving room for the middle guys to take up some slack . With no kit.
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
'Drema and the Thwaites're 24 this year .... JakieB is 34 :oops: ...... and Humperdumper is 44 ..... deserves some TLC 'praps :unsure::giggle:
 
D

DaveDCB

Well-known member
However I can tell you with conviction. There is a huge shortage of kit , hs2 is about to go mental which will take the big boys over there leaving room for the middle guys to take up some slack . With no kit.
Kit is the least of the problem it’s decent operators!!
 
Left hooker

Left hooker

Well-known member
I Can understand there is alot of companies with covid cash that are trying to spend it before it's taken away
And that some small firms will be buying a machine for the first time
Coupled with the decrease in production for several months will cause a slight shortage

But how can gearing up for the government schemes really cause that much of a demand in machines
What happened to all the existing machines
And who is going to drive these extra machines
If it's that bad surely some of the cpcs hero's will have to suck it up and drive a machine with more than 10 hrs
Or maybe the big sites can make do without lines of machines parked up doing FA
Is this really a problem or are machines the new toilet roll
Government projects normally require the latest emissions standard kit so brand new for likes of hs2 and the new a30 dualing in Cornwall just starting has a lot of new flannery kit arriving daily
 
JD450A

JD450A

Feral as Fk 🐾
and the new a30 dualing in Cornwall just starting has a lot of new flannery kit arriving daily
Cornish Pasty munchers should be firing the f****ng things..... How the f**k can it be considered sustainable to haul plant 200+ miles when ECC has the required gear on the doorstep.....
 
GazCro

GazCro

Well-known member
Cornish Pasty munchers should be firing the f****ng things..... How the f**k can it be considered sustainable to haul plant 200+ miles when ECC has the required gear on the doorstep.....
No different to the EA hiring diggers off them to play in the river when their own are probably parked up 20 mile away.
 
Left hooker

Left hooker

Well-known member
Cornish Pasty munchers should be firing the f****ng things..... How the f**k can it be considered sustainable to haul plant 200+ miles when ECC has the required gear on the doorstep.....
Here's the kicker
Costains ain't exactly local either
All agg is coming from Plymouth and walking floor artic's only no tippers allowed can't even think of one walking floor trailer in a cornish fleet
 
Vinpetrol

Vinpetrol

Well-known member
I worked in plant in London in the 80s for an Irish outfit Marron. There were a few around London then . 2 off them have just turned up in the highlands ! Carey’s and Pat Flannery .
 
JD450A

JD450A

Feral as Fk 🐾
Here's the kicker
Costains ain't exactly local either
All agg is coming from Plymouth and walking floor artic's only no tippers allowed can't even think of one walking floor trailer in a cornish fleet
As said.... fire and kicking off should be the cornish mantra with it.

I don't exactly see the problem with Costains doing it, but to use plant from f****ng miles away is a pisstake.
 
Left hooker

Left hooker

Well-known member
As said.... fire and kicking off should be the cornish mantra with it.

I don't exactly see the problem with Costains doing it, but to use plant from f****ng miles away is a pisstake.
Brown envelope to costains from there buddy's at flannery I guess
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
probably have a flat rate deal ...... where ever they are in the UK they'll supply at £xx and have to swallow the costs of tranny over and above a std rate
crane game was always the same ..... big boys'd put a 50/60 tonner out at 18/20t rate and tramp 'em bloody miles at agreed flat rates .... no one local could compete ........ race to the bottom - in freefall usually .
 
S

Smiffy

Well-known member
Government projects normally require the latest emissions standard kit so brand new for likes of hs2 and the new a30 dualing in Cornwall just starting has a lot of new flannery kit arriving daily

But the emissions standards last longer than 3 years, the kit lasts longer than 3 years
And they could try working more efficiently with less kit.
All it does is polish the ego's of the stick pullers on the jobs

When they where doing the M23 and m25 upgrades already 30% of the excavators where sat doing nothing with operators watching Netflix in the cab

It's just another form of waste that big sites are so good at
 
Top