Neilporteous
Active member
Hi Guys, looking at a yard, the only access is over a small burn, there is currently a bridge in place which needs replaced.
The current bridge consists of 2 steel beams spanning the burn with 20x 200mm x 100mm x 2.4m sleepers, they are past their best.
The new bridge needs to be wider, around 3.6 metres, the span over the burn is 4 metres.
How would you go about a new bridge? Any previous examples and pictures?
The current bridge consists of 2 steel beams spanning the burn with 20x 200mm x 100mm x 2.4m sleepers, they are past their best.
The new bridge needs to be wider, around 3.6 metres, the span over the burn is 4 metres.
How would you go about a new bridge? Any previous examples and pictures?
