Routy56 - can you just....

Routy56

Routy56

Well-known member
Cudos to the stand its having a proper workout there 👍 Considered one myself, makes messin a bit easier and why not :)
Can you get her onto the centre stand on so wheels can come off etc ?
Yep, sure can get it onto the centre stand, it got some heavy metal underneath the chequer plate. That'll be my next move after I've dragged it away from the dart board. We need to use that at Christmas. It's gonna be a long careful recommission :cool:
 
Routy56

Routy56

Well-known member
gotta take half the back end apart to get the rear out :(:( - can't see why you couldn't get it onto the centre stand though and looks to have a drop out plate for dropping the rear out -- assuming you can slip the spindle out of course :rolleyes::oops::censored:
not looking forward to doing mine :cry:
Yep gonna take the rear wheel out. And yes there is a plate that can be removed for that :p
 
Bri963

Bri963

Well-known member
Morning Bri, nope that yellow crawler is an International Drott. I would have loved to have a play with that 🥰
Well during my time, at Essex Police, we had all sorts, BMW R80 s R100 s etc.
Then a period with no bikes. Then came back with Honda Pan Europeans. These day it's mainly BMWs.
Although I was 9 years on Traffic, I was never an authorised Bike Permit holder.
Considering I was thinking of a classic bike, such as an old BSA Bantam, the Goldwing was offered to me at a very low price 😚

View attachment 86320
So over the weekend, my grandson's helped me heave it onto the 'new' lift from Machine Mart 😎
Tucked it to one side in my workshop, so I can strip it down and still get access to the pit etc.
Not going to try and start it until I've at least done the cam belts ;)
What model Drott, Dave? Looks too small for a 100, and that was the smallest one they build at Doncaster. There was a B75, think it was German and about the same size as the Bristol Taurus.
 
Routy56

Routy56

Well-known member
So yesterday morning (Tuesday) it was windy pissing down here :eek:
Just after 7am, Ryan phones me, "Grandad, my car has overheated and there steam everywhere"
He leaves just after 6am each morning to drive 40-50miles to work on construction sites.
Established that he had pulled off the A12 at Marks Tey, about 25 miles away and I knew what the problem would be :rolleyes:
IMG_3013.jpeg

So just after 8am I rocked up and the Corsa loaded onto the Ifor. You know when you wanna do wheel straps and not only do all the other motorists have to rush/squeeze past inches from death AND it absolutely deluged down :oops:
Gave Ryan a spare jacket 'cos he'd left his at work!
All loaded up and back into warm dry Navara, A12 then A120 cruise control on with "Smooth Chill" playing. Such a nice place to be when drama threatens to kick off :love:
IMG_3014.jpeg

Back in the workshop, got Ryan to strip it down and remove the plastic flange multi-way plastic pipe thingy on the left side of the cylinder head.
Over the weekend, I noticed that it was weeping and had ordered a replacement from Amazon. Useful for next day stuff.

IMG_3015.jpeg

So here's the culprit my pick is indicated a nasty crack about 75mm long in the plastic :oops:
The inside of the plastic was like cheese and the rubber shed O rung was crashed flat.
Apparently these are common failures on Corsa and similar car of this age (12 plate)
Big air lock had to be cleared upon refilling...

With our fingers crossed we took it on a few local road tests. No temperature gauge on dash. Just an overheating warning light. But Ryan knows the hidden menu to bring p temperature reading on the digital display. We watched it rise, as it should steadily, and then as the thermostat opened settled at about 95c -98c which Ryan said is normal. The engine/head gasket had not been damaged (as far as we could tell).

Job jobbed for now (y)
 
Routy56

Routy56

Well-known member
On Sunday, I cleaned up the Navara inside and out ready for the MOT test on Tuesday. I've had it form new in November 2018 and now has only 45k on the clock :cool:
IMG_7567.jpg


But before I could get it to the MOT test place at 11am, I had to go out in all that wind and rain to recover the Corsa. It then looked like a working truck :p

"Hey Dave, you can come and pick up your precious Navara"
Another years MOT ticket with no advisories :love:

Now gonna Tax it - it's gone up again from last years £345 to £360 :rolleyes:
Don't get me started on the state of the roads, potholes, ditches and overgrown roadside vegetation :mad:
 
Routy56

Routy56

Well-known member
So in my bike ride yesterday into Harwich, spotted this Ineos Grenadier outside the RNLI Station
IMG_3020.jpeg

Got chatting to the driver, who is a national coordinator type guy.
The RNLI were given 5 x Grenadiers by the manufacturers. All they had to do was kit them out costing about £50k. This one was being used to deliver a new Atlantic 85 RIB for training purposes :giggle:

On the way back has a look at a potential jobette, for a friend at the running club.
IMG_3021.jpeg

"Dave can you just dig out for block paving parking area, about 12 square metres at 200mm deep"
It's the snags that take the time, and I can see a few already 😚
 
Routy56

Routy56

Well-known member
Then further up the road on a shared pedestrian and bicycle path found another problem that keep occurring...
IMG_3023.jpeg

Every time there are high wind this happened from the overgrown stuff. The previously trimmed back trunks have rotted out and the 'new' growth simply pulls it over. Reported, but like last time, the locals will probably cut it back. What pisses me off is that there is no programme of vegetation management beside our highways 😡

IMG_3024.jpeg

Back into my 'happy space' and having a cleanup, I thought, well I may as well tart this up...

IMG_3025.jpeg

My Barn Workshop has 6 concrete slabs, so as I move stuff around, then I'll slap some floor paint on with that roller ☺️
The object of this exercise is to clear a space to pull the bike lift and Goldwing onto for more fettling. Apparently the Dart Board has to be clear by Christmas 😚
 
Lancs Lad

Lancs Lad

Well-known member
So in my bike ride yesterday into Harwich, spotted this Ineos Grenadier outside the RNLI Station
View attachment 86379
Got chatting to the driver, who is a national coordinator type guy.
The RNLI were given 5 x Grenadiers by the manufacturers. All they had to do was kit them out costing about £50k. This one was being used to deliver a new Atlantic 85 RIB for training purposes :giggle:

On the way back has a look at a potential jobette, for a friend at the running club.
View attachment 86380
"Dave can you just dig out for block paving parking area, about 12 square metres at 200mm deep"
It's the snags that take the time, and I can see a few already 😚
Might want to watch out for planning on that ..seen a few get pulled up here fro ripping out "gardens" and making into handstanding..joke I know but might be worth a check. Especially if he's got nosy neighbours
 
Routy56

Routy56

Well-known member
Might want to watch out for planning on that ..seen a few get pulled up here fro ripping out "gardens" and making into handstanding..joke I know but might be worth a check. Especially if he's got nosy neighbours
Yep - good shout that (y)
Personally, I'm aware of SUDS requirements. But it ain't my job.
The son-in-law is a groundworker is taking the lead on that one and grovelling on his knees laying the blocks etc.
Already I can see a few snags, like ground sloping towards the house, and the IC etc.
I'll add SUDS to the likely snags - thanks ;)
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Then further up the road on a shared pedestrian and bicycle path found another problem that keep occurring...View attachment 86381
Every time there are high wind this happened from the overgrown stuff. The previously trimmed back trunks have rotted out and the 'new' growth simply pulls it over. Reported, but like last time, the locals will probably cut it back. What pisses me off is that there is no programme of vegetation management beside our highways 😡

View attachment 86382
Back into my 'happy space' and having a cleanup, I thought, well I may as well tart this up...

View attachment 86383
My Barn Workshop has 6 concrete slabs, so as I move stuff around, then I'll slap some floor paint on with that roller ☺️
The object of this exercise is to clear a space to pull the bike lift and Goldwing onto for more fettling. Apparently the Dart Board has to be clear by Christmas 😚
can't beat a 4" fluffy roller for floor paint application :giggle::giggle: (y)
round here any growth over a footpath gets you a letter telling you to cut back to your boundary ... but if it's 'theirs' it seems to go un-noticed :rolleyes: for years :mad: double std.s or what 🤬🤬🤬 (and there are a myriad of examples)
 
Routy56

Routy56

Well-known member
can't beat a 4" fluffy roller for floor paint application :giggle::giggle: (y)
round here any growth over a footpath gets you a letter telling you to cut back to your boundary ... but if it's 'theirs' it seems to go un-noticed :rolleyes: for years :mad: double std.s or what 🤬🤬🤬 (and there are a myriad of examples)
Yeah - got a pack of the fluffy things. Simply throw them away rather than clean up. :p
When we had buses through here they would have to cut through swathes of overgrown stuff and were fitted with cutting bars on the top deck left side. No longer a bus service here making our bus passes redundant. You couldn't make it up :rolleyes:
I often give Highways various reports, usually take's them about 2 - 3 years to get something done.
Choked up ditches and grips piss me off - water runs down teh road and not in the ditch FFS:mad:
Best ones are the PRW department. Tell them about a broken footbridge and it's usually done within 1 or 2 days :)
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Yeah - got a pack of the fluffy things. Simply throw them away rather than clean up. :p
When we had buses through here they would have to cut through swathes of overgrown stuff and were fitted with cutting bars on the top deck left side. No longer a bus service here making our bus passes redundant. You couldn't make it up :rolleyes:
I often give Highways various reports, usually take's them about 2 - 3 years to get something done.
Choked up ditches and grips piss me off - water runs down teh road and not in the ditch FFS:mad:
Best ones are the PRW department. Tell them about a broken footbridge and it's usually done within 1 or 2 days :)
one bus a day - from the village, two miles away :rolleyes: ... never bothered to even get mine, but Pam has one
sides of the lanes here are all choked up with hedge cuttings ... usually can't see the black top after they've been through .. you or I littering the roads
like that'd have them on our backs instantly .... should all be compelled to have a sweeper following them AND traffic control
haven't seen a sweeper in years, up round here and the lanes get narrower by the year/cut
 
CPS

CPS

Well-known member
There is absolutely no infrastructure maintenance done around here at all, its a joke.
Hedges allowed to grow out into the roads, which In turn makes drivers drive in the middle if the road too..

The hedge near our house grows out over a well used footpath along a pretty busy road.
Last year on a few occasions I seen people step off the footpath infront of on coming cars a few times... I nearly hit one..

I phoned the local council who said that it wasn't there responsibility and told me to call DFI roads.
I called them and told them that someone was going to get run over, to be fair they were out the next day and had it cut
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
There is absolutely no infrastructure maintenance done around here at all, its a joke.
Hedges allowed to grow out into the roads, which In turn makes drivers drive in the middle if the road too..

The hedge near our house grows out over a well used footpath along a pretty busy road.
Last year on a few occasions I seen people step off the footpath infront of on coming cars a few times... I nearly hit one..

I phoned the local council who said that it wasn't there responsibility and told me to call DFI roads.
I called them and told them that someone was going to get run over, to be fair they were out the next day and had it cut
well that was a result ... but probably wetting themselves over liability claims, especially once it had been 'flagged' by you :rolleyes:

would take them years to respond around here --
but as said, if you've a 'domestic' hedge encroaching, the letters appear thick and fast, threatening the cost of 'contractors' to undertake any cutting back and we may only be talking 6" of growth ...
they're like the Stasi and the SS combined 🤬 .....
but their own liabilities go untouched for years🤬🤬:mad:
 
pettsy

pettsy

Well-known member
It varies round here. I reported a small section of overgrown hedge on the access road to our cul de sac. Could have done it myself but thought why should I!? Within a week the Council sent a tractor with a flail and smashed it back, happy days. On the other hand, there’s a private hedge nearby about 3ft into the road that I have to drag my van mirror through when passing cars. Owner clearly can’t be bothered….I’d give them a month to sort it then send the council bill. There’s no excuse for anything to be overhanging the road!
 
6

6feetdown

Well-known member
well that was a result ... but probably wetting themselves over liability claims, especially once it had been 'flagged' by you :rolleyes:

would take them years to respond around here --
but as said, if you've a 'domestic' hedge encroaching, the letters appear thick and fast, threatening the cost of 'contractors' to undertake any cutting back and we may only be talking 6" of growth ...
they're like the Stasi and the SS combined 🤬 .....
but their own liabilities go untouched for years🤬🤬:mad:
Not many (if any) 13ts that are legal on a 26t. We only move on 32t, in terms of what to look out for, obviously a 13t is a lot bigger than an 8t when loading, you will likely be slightly overhanging both sides of the truck. I have loaded and unloaded a fair few, often do it for drivers if they are nervous or the weathers rough etc.
If your machine is say a foot wider than the truck bed, just keep an eye on one side whilst going up, make sure you keep it straight and only the 6" overhanging, the other side will look after itself. A lot easier to concentrate that way.
With regard to buckets and a blade, I guess you mean not being able to pinch the spare buckets between the grader and the blade when loading? There's no right and wrong that I am aware of, most drivers have their own way. If you have a bulk bucket with teeth going out have that on the machine and pick the others up with the teeth through the pins, however some companies might not like that. Worth having a 4 or 5 foot drop chain and loading them either before or after the machine. Obviously if you have space its easier to load them before, then you're not rocking around all over the place on the back of the truck.
Bear in mind a 13t is a lot on a rigid, its a lot more unforgiving if you don't put your ramp props down properly you'll bend them, if you dont drop the air out of the suspension its going to be very wobbly! If you are struggling to climb the ramps in the wet with steel tracks, either back on and push yourself with the bucket, or put a chain with plenty of slack in it from side to side of the bed behind the cab and pull yourself up with that.
I have loaded a fair bit of kit on lorries of all sizes, from remote control crushers on artics to track dumpers up ramps onto a tar body 18t, a 13t is a long way up in the air on a 32t.
Take your time and keep the revs down. Theres a few clips out there of people slewing too fast or jerkily and throwing themselves off the side. if you think it might be going wrong, stop, take it back off and start again.

where's that Andy -- don't recognise it??

my younger brother has the dubious 'honour 'of taking a decker through the old bridge arch at Monmouth.:oops:
was a fitter for Red & White ... B/hol Aug. Monday - decades ago - came out the old bus station on a road test after a service ... looked up the main street and thought sod that, so hung a right .... Monmouth fleet was 14 singles and ONE decker ... forgot he was in it and crunch!! - in slo-mo -- the glass cascading down the stairs behind the driver's seat had him stopping about 5 feet in :ROFLMAO::ROFLMAO:
now closed to road traffic completely

" Britain’s only surviving medieval bridge with a fortified gate on its span "
View attachment 85806

they're like the Stasi and the SS combined 🤬
This
 
B

bobthebuilder

Well-known member
Yep - good shout that (y)
Personally, I'm aware of SUDS requirements. But it ain't my job.
The son-in-law is a groundworker is taking the lead on that one and grovelling on his knees laying the blocks etc.
Already I can see a few snags, like ground sloping towards the house, and the IC etc.
I'll add SUDS to the likely snags - thanks ;)
100sqm before suds
 
Top