there must be a lot of architects cr*pping them selves ATM .... lots of insurers will no longer touch them for PI renewals


"United Living has beaten an attempt by architect Hawkins Brown to shut down a fresh £7.4m defects claim over a north London flats development."

" Dangerous structure notices were served demanding immediate temporary works and risk mitigation at Centurion Tower, Sovereign Tower and St Vincent’s Court in Canning Town, east London.

The crisis widened on Friday when residents of neighbouring Thanet Tower and Prince Court were also told to leave following a further engineering assessment of the concrete transfer slab beneath the buildings.

Around 211 households had already been evacuated from the original three blocks overnight on 22–23 October........Concerns centre on the transfer slabs supporting the buildings at the Royal Gateway development, also known as Caxton Works. Earlier letters to residents warned that problems “could result in a collapse”. " :oops::oops::oops:
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
I know..an absolute joke.
and on the subject of water/water suppliers

" The 22.8km pipeline will connect Crab Wood service reservoir near Winchester with Micheldever Road service reservoir on the outskirts of Andover.
Some early preparation work, such as vegetation clearance, is expected to start later this year, with full construction likely to begin in winter 2027, lasting 3.5 years. "

who in their right mind begins this sort of work/project in mid winters ????? :unsure:o_O:oops::oops::oops:
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
and a.n.other ........ :mad::mad:

"The development will take advantage of Drax’s existing 1,000-acre power station estate, which already boasts a 4GW grid connection, 2.6GW of active electricity generation capacity and established cooling infrastructure.

These existing assets could help the developers overcome some of the biggest obstacles facing major UK data centre projects, particularly grid connections and access to reliable power. "
and where is all the leccy that they deplete from the grid going to come from to supply existing users/customers ?????
aaannndddddd.....
https://www.constructionenquirer.co...tty-to-build-britains-biggest-substation-job/

" National Grid Electricity Transmission announced it had bought the 73-acre Dorman Point site for the massive new power facility.

The Teesside Node A substation will initially provide 1.44GW of additional electricity capacity to support major data centre, AI, advanced manufacturing and other energy-intensive developments across the former steelworks site.

The project, thought to be worth over £200m, forms part of National Grid’s Great Grid Upgrade programme, with the first 1,440 MVA of capacity scheduled to come online by the end of 2029. "

won't be a lot left over for anything after the data centres pull what they want
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better

would you buy a s/h car off these three ? current form for EOTs is 12 -18 months before collapse
1794010182825.png


get to keep their jobs and walk away with their pockets stuffed ;):rolleyes:
 
6

6feetdown

Well-known member
and a.n.other ........ :mad::mad:

"The development will take advantage of Drax’s existing 1,000-acre power station estate, which already boasts a 4GW grid connection, 2.6GW of active electricity generation capacity and established cooling infrastructure.

These existing assets could help the developers overcome some of the biggest obstacles facing major UK data centre projects, particularly grid connections and access to reliable power. "
and where is all the leccy that they deplete from the grid going to come from to supply existing users/customers ?????
Power cuts and rationing
 
R

Rob65

Well-known member
and on the subject of water/water suppliers

" The 22.8km pipeline will connect Crab Wood service reservoir near Winchester with Micheldever Road service reservoir on the outskirts of Andover.
Some early preparation work, such as vegetation clearance, is expected to start later this year, with full construction likely to begin in winter 2027, lasting 3.5 years. "

who in their right mind begins this sort of work/project in mid winters ????? :unsure:o_O:oops::oops::oops:
Probably driven by needing to avoid the breading season for some endangered species of insect that no normal person knows about so won’t miss when it’s gone.
 
doobin

doobin

Well-known member

yet another government balls up

" MJ Gleeson is warning that the government’s new Your First Home scheme could stall the housing market for months.


The house builder welcomed the scheme for first time buyers in a trading update today but flagged issues over its timing.
The initiative was confirmed in last month’s budget but applications for the first loans won’t begin until February.
Gleeson said: “The announcement of the scheme some five months before its launch is likely to postpone demand in the intervening period and to increase cancellations.
“We anticipate a weaker first-half, with the pace of recovery in the second half increasingly dependent on the efficient and timely introduction of the scheme.

“Given the likely timings of the introduction of Your First Home and its impact on Gleeson Homes’ sales, as well as the visibility around the timing of disposals in Gleeson Land, the Board anticipates that profits will be significantly weighted towards the second half of the year with delivery of market consensus1 for FY2027 reliant on further improvement in buyer confidence.” "
The government balls up was in agreeing to restart such a terrible scheme.

Let the market be the market FFS!!! These constant hand outs to big developers is a kick in the balls to everybody's children.
 
Canal Navvy

Canal Navvy

Well-known member
Probably driven by needing to avoid the breading season for some endangered species of insect that no normal person knows about so won’t miss when it’s gone.

More like a species that is relatively common but never reported as it could hinder ongoing work 🤔
 