Furniss
Well-known member
The fields at the back of this farm all slope towards it - looks like its been a problem for years - we are down to do some work there in the new year but first job will be to sort this problem.
plan to start with a bund along some of back turning it into a ditch which I will cut, most of it is going to be open ditch to an existing ditch but a length of about 40m is going to have to be piped in.
Whats the consensus on pipe size needed ...... I would say the video was taken at peak flow and there is lots of fall.
www.dropbox.com
plan to start with a bund along some of back turning it into a ditch which I will cut, most of it is going to be open ditch to an existing ditch but a length of about 40m is going to have to be piped in.
Whats the consensus on pipe size needed ...... I would say the video was taken at peak flow and there is lots of fall.