S
Stroppymonkey
Well-known member
I have a few concrete pads and tracks to lay over the coming years. Probably about 500m sq by the end of it .
Being stubborn and tight I would prefer to do it myself , usually have ability to pull labour in when needed.
I grew up laying concrete on the farm, but very rough and ready / site mixed usually and tamped finish.
We lay slabs on a weekly basis for oil tanks , and have progressed to using an edge trowel which felt like sophistication at the time 🫣
Looking to learn to float properly and get a brushed finish. Fallen down the rabbit hole of you tube videos and looking at all the tools available.
Local hire place has a beam screeder / power float.
Trying to get advice on the best bull float to finish ready mix prior to brushing. Prices and materials vary so much
.
Brush finish . Do you need a fresno broom or just use a simple brush?
Brush attachment for the normal bull float or a dedicated blade just for the broom?
3’ or 4’
Never going to be more than 15ft reach required.
Pic for attention
Being stubborn and tight I would prefer to do it myself , usually have ability to pull labour in when needed.
I grew up laying concrete on the farm, but very rough and ready / site mixed usually and tamped finish.
We lay slabs on a weekly basis for oil tanks , and have progressed to using an edge trowel which felt like sophistication at the time 🫣
Looking to learn to float properly and get a brushed finish. Fallen down the rabbit hole of you tube videos and looking at all the tools available.
Local hire place has a beam screeder / power float.
Trying to get advice on the best bull float to finish ready mix prior to brushing. Prices and materials vary so much
Brush finish . Do you need a fresno broom or just use a simple brush?
Brush attachment for the normal bull float or a dedicated blade just for the broom?
3’ or 4’
Never going to be more than 15ft reach required.
Pic for attention