The 'Today's Job' thread

V8Druid

V8Druid

do it as well as you can,but learn to do it better
Our kid...12 yr old.
His First saw. Saved from the scrap and stripped it. Cost him 23 quid for bar and chain. Now happy as Larry doing firewood.
No iPad in sight 😂
And a good mate donated some trousers for a bottle of bourbon.
View attachment 70589
gonna need one of these next :giggle::giggle:
WP_20201222_14_59_28_Pro.jpg
 
S

Stroppymonkey

Well-known member
All weekend job - but not at all plant related. Doing some charity work replacing mother in laws boiler. My time for free but she will be paying full whack for the lad going back tomorrow to finish it off.
Last one was 33 years old and was put in new when they built the ag bungalow.
Testing the little dewalt saw to its max today. Juiced 2 9amp batteries on that little trench. Should have packed the 110v one or the reluctant Makita 2 stroke.
Really nice to be able to spend a couple of days on the tools with no work phone distractions. I think I’d actually quite like my job if I didn’t have to talk to anybody …
 

Attachments

  • f567f56c-24d5-427b-8c4c-77c23e228bbd.jpeg
    f567f56c-24d5-427b-8c4c-77c23e228bbd.jpeg
    110 KB · Views: 127
  • fd450d37-17b3-47ba-9298-6263f0f77057.jpeg
    fd450d37-17b3-47ba-9298-6263f0f77057.jpeg
    213.8 KB · Views: 108
  • 8fd80adf-83b4-4306-8603-22a3ed38338e.jpeg
    8fd80adf-83b4-4306-8603-22a3ed38338e.jpeg
    192.7 KB · Views: 74
  • c58985e9-97ec-4823-8815-cd37a8b0fb30.jpeg
    c58985e9-97ec-4823-8815-cd37a8b0fb30.jpeg
    191.8 KB · Views: 92
  • 3B55C2A3-41DC-49FB-BD02-F3C0E3D626E1.jpeg
    3B55C2A3-41DC-49FB-BD02-F3C0E3D626E1.jpeg
    114.4 KB · Views: 90
  • IMG_3218.jpeg
    IMG_3218.jpeg
    387.4 KB · Views: 83
M

Monkeybusiness

Well-known member
All weekend job - but not at all plant related. Doing some charity work replacing mother in laws boiler. My time for free but she will be paying full whack for the lad going back tomorrow to finish it off.
Last one was 33 years old and was put in new when they built the ag bungalow.
Testing the little dewalt saw to its max today. Juiced 2 9amp batteries on that little trench. Should have packed the 110v one or the reluctant Makita 2 stroke.
Really nice to be able to spend a couple of days on the tools with no work phone distractions. I think I’d actually quite like my job if I didn’t have to talk to anybody …
3 days for a boiler swap?!
I think you need to give up the plumbing malarkey, not sure you are cut out for it…
(Unless it was a clever ruse to spin the job out long enough to be able to justify billing your family for the massive hourly rate tomorrow’s guy is going to cost them, in which case I salute you sir!!!)
 
Routy56

Routy56

Well-known member
All weekend job - but not at all plant related. Doing some charity work replacing mother in laws boiler. My time for free but she will be paying full whack for the lad going back tomorrow to finish it off.
Last one was 33 years old and was put in new when they built the ag bungalow.
Testing the little dewalt saw to its max today. Juiced 2 9amp batteries on that little trench. Should have packed the 110v one or the reluctant Makita 2 stroke.
Really nice to be able to spend a couple of days on the tools with no work phone distractions. I think I’d actually quite like my job if I didn’t have to talk to anybody …
Good to see that you're installing a nice Grant oil boiler :giggle:
We installed a Grant VortexBlue a few year ago to replace the 30 year old Boulter Camray 2.
And that gave excellent service after many rebuilds - bit like triggers broom :p
As far as I'm concerned an efficient oil boiler is still the best solution for heating ;)
 
S

Stroppymonkey

Well-known member
Good to see that you're installing a nice Grant oil boiler :giggle:
We installed a Grant VortexBlue a few year ago to replace the 30 year old Boulter Camray 2.
And that gave excellent service after many rebuilds - bit like triggers broom :p
As far as I'm concerned an efficient oil boiler is still the best solution for heating ;)
If you cut me in half it will read Grant 🤣. We have fitted 100s of em.
Big difference in efficiency and lifespan depending on how it’s installed and commissioned. Bit like engines I guess.
VortexBlue thankfully now discontinued. Only put on the market in anticipation of an emissions requirement that never happened. Boilers the same but the BlueFlame burner has a fussier and more expensive control box. Efficiency the same though.
 
S

Stroppymonkey

Well-known member
3 days for a boiler swap?!
I think you need to give up the plumbing malarkey, not sure you are cut out for it…
(Unless it was a clever ruse to spin the job out long enough to be able to justify billing your family for the massive hourly rate tomorrow’s guy is going to cost them, in which case I salute you sir!!!)
We allow 3 days for a standard oil boiler exchange with upgrades.
This one going from a poorly installed f+e system to sealed, new thermister based ch/hw controls, few adjustments to existing pipework, new oil supply and full power flush which is our standard basic option. Plenty round here doing budget boiler swaps, but we like to offer an exceptionally well designed and well installed efficient system. We seem to keep busy.
Extra £1500 on an install will be recovered easily on better efficiency and less maintenance over coming years.
There is a race to the bottom with boiler installs which we won’t participate in.
Also.. as it’s the weekend it was only 12 hours work spread over the 2 days so just one ‘proper’ day 😁
Careful, I shall mount my high horse and start banging on about #energywastage 🤣
 
M

Monkeybusiness

Well-known member
We allow 3 days for a standard oil boiler exchange with upgrades.
This one going from a poorly installed f+e system to sealed, new thermister based ch/hw controls, few adjustments to existing pipework, new oil supply and full power flush which is our standard basic option. Plenty round here doing budget boiler swaps, but we like to offer an exceptionally well designed and well installed efficient system. We seem to keep busy.
Extra £1500 on an install will be recovered easily on better efficiency and less maintenance over coming years.
There is a race to the bottom with boiler installs which we won’t participate in.
Also.. as it’s the weekend it was only 12 hours work spread over the 2 days so just one ‘proper’ day 😁
Careful, I shall mount my high horse and start banging on about #energywastage 🤣
I’m only yanking your crank!
My plumber spent 5 days installing our Sapphire - fortunately (for me) he was doing it on a price!
 
groundworker

groundworker

Well-known member
Got the blinding down on this job ready for the very expensive stack of polystyrene to go down.


View attachment 70222
So glad to see the back of this one last week, gotta be the most complication foundation going especially for a back extension.

It's piled, cantilevered, stepped (twice), insulated (two thicknesses), protected from heave (two thicknesses), reinforced with bars at 75mm centres in places, shear rails, you name it.

PXL_20250319_112930023.jpg
 

Attachments

  • PXL_20250320_144846346.jpg
    PXL_20250320_144846346.jpg
    300.6 KB · Views: 74
  • PXL_20250320_102002205.jpg
    PXL_20250320_102002205.jpg
    302.2 KB · Views: 74
  • PXL_20250320_094545865.jpg
    PXL_20250320_094545865.jpg
    300.2 KB · Views: 70
  • PXL_20250320_094510485.jpg
    PXL_20250320_094510485.jpg
    320 KB · Views: 64
  • PXL_20250319_112930023.jpg
    PXL_20250319_112930023.jpg
    412.9 KB · Views: 67
  • PXL_20250319_112900106.jpg
    PXL_20250319_112900106.jpg
    394.4 KB · Views: 74
  • PXL_20250318_144900880.jpg
    PXL_20250318_144900880.jpg
    353.1 KB · Views: 76
  • PXL_20250313_110708398.jpg
    PXL_20250313_110708398.jpg
    328.4 KB · Views: 116
6

6feetdown

Well-known member
So glad to see the back of this one last week, gotta be the most complication foundation going especially for a back extension.

It's piled, cantilevered, stepped (twice), insulated (two thicknesses), protected from heave (two thicknesses), reinforced with bars at 75mm centres in places, shear rails, you name it.

View attachment 70663
Single storey?
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
So glad to see the back of this one last week, gotta be the most complication foundation going especially for a back extension.

It's piled, cantilevered, stepped (twice), insulated (two thicknesses), protected from heave (two thicknesses), reinforced with bars at 75mm centres in places, shear rails, you name it.

View attachment 70663
elephant enclosure is it :oops::oops::oops: WTF spec.ed that :oops:
 
6

6feetdown

Well-known member
Essentially 1.5 storey as there's living space in the roof.


There's 2 steel posts to sit on the cantilevered, thinnest part of the slab, lots of weight on them apparently so I can see the thought behind it but think the engineer might have over done it a tad!
Definitely looks that way lol
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Essentially 1.5 storey as there's living space in the roof.


There's 2 steel posts to sit on the cantilevered, thinnest part of the slab, lots of weight on them apparently so I can see the thought behind it but think the engineer might have over done it a tad!
they don't like risking their professional indemnity cover :rolleyes::mad:
 
William127

William127

Well-known member
New (to me, clearly 😆) digger day👍👍
Straight to work clearing up the 100 odd ton of soil I've dug out at the barn.
Machine is just what I wanted- apart from being used obviously- feels just like a bigger version of my 217r. Felt really stable on the 3 plus meter high pile, great visibility, quiet and smooth (apart from the comedy quick hitch 😂 but that's changable).
3 diggers is slightly ridiculous for me as a 1 man band, especially given the amount of time I spend in a completely different industry, but I shall probably solve this next year by buying a 4th 😆 🤣 😂
 

Attachments

  • 20250325_171423.jpg
    20250325_171423.jpg
    342.8 KB · Views: 91
Top