S
Smiffy
Well-known member
Sounds like not enough cement and not enough overlap. Also if there was existing organic matter in the soil you've no chance as it impedes the chemical reaction in both cement and lime.
This was done as a layer of recycled 80mm down crush and then the stabilization kit run through that rather than into existing ground.