The 'Today's Job' thread

groundworker

groundworker

Well-known member

Attachments

  • Screenshot_20250306-193320.png
    Screenshot_20250306-193320.png
    1.1 MB · Views: 127
  • Screenshot_20250306-193424~2.png
    Screenshot_20250306-193424~2.png
    1.1 MB · Views: 118
Storrsy

Storrsy

Well-known member
Seems it's not rare occurrence in the tily gripper world , my mate did his first day 🤣 and tbf it's a pretty controlled way of straightening it by pressing down with blade....

That dunt make it right though :)
How did you bend it?
 
Left hooker

Left hooker

Well-known member
Cut out the levels in January finally got round to dragging the converted horse box that's going to be a sauna up on to the first level had to make the ramp out of type 1
Had lifting chains and brake away cable attached to digger and to trailer as redundancy back ups
Type 1 going up tomorrow to hardcore the level and slope down leaving just enough to get down and then throw rest up on to slope for them to wheel barrow up later date


IMG_20250310_152723.jpg


IMG_20250310_152716.jpg


IMG_20250310_152730.jpg
 
William127

William127

Well-known member
Crane day today, some big tent in London.
Awkward job, not a lot of room to work, especially for ladders /towers. All lifts done, off site a 6.30 and home by 7.15! 👍
Back tomorrow to finish off.
 

Attachments

  • 20250310_182111.jpg
    20250310_182111.jpg
    99.2 KB · Views: 69
  • 20250310_105318.jpg
    20250310_105318.jpg
    156.2 KB · Views: 67
  • 20250310_105314.jpg
    20250310_105314.jpg
    167.4 KB · Views: 67
  • 20250310_090537.jpg
    20250310_090537.jpg
    196.7 KB · Views: 67
  • 20250310_090523.jpg
    20250310_090523.jpg
    190.6 KB · Views: 73
  • 20250310_090531.jpg
    20250310_090531.jpg
    128 KB · Views: 63
Top