would you want a house on these ?

V8Druid

V8Druid

do it as well as you can,but learn to do it better
yeh, but they'd all need to be perfectly bang on level and the ground prep around them'd need to be bloody good to prevent point/stress loading and possible cracking

and this is a box ticking bullsh1t exercise 👇👇👇

" “Using sustainable methods of production at our purpose-built facility and existing equipment for installation, we’re able to reduce our carbon footprint and offer developers a more modern and energy efficient alternative to existing ground beam options. "
 
groundworker

groundworker

Well-known member
These have been around a while, not sure what this system is doing that's new. I can definitely see the argument for a beam that's been fixed, shuttered and poured in a factory setting rather than on a wet muddy site (less chance of concrete being pissed up, bad steel fixing, poor cover on bars etc.)

I don't see what the ground prep has to do with it? I'd be more interested to know how they pack up to level/grout void off of the cropped piles. And how they connect the beams at joints.
 
groundworker

groundworker

Well-known member
Seems like a better way of getting a heave void than using cellcore too.

Screenshot_20240305-120044~2.png
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Seems like a better way of getting a heave void than using cellcore too.

View attachment 58232
presumably those joints are all cast in situ? ..... looks a bit more like it :cool:
now all they have to do is cast the piles 3 (or more) feet higher and flood plain building is dealt with .. nice breathable void under the house . job done (y)
 
S

Smiffy

Well-known member
yeh, but they'd all need to be perfectly bang on level and the ground prep around them'd need to be bloody good to prevent point/stress loading and possible cracking

and this is a box ticking bullsh1t exercise 👇👇👇

" “Using sustainable methods of production at our purpose-built facility and existing equipment for installation, we’re able to reduce our carbon footprint and offer developers a more modern and energy efficient alternative to existing ground beam options. "

I don't see why the ground prep would need to be good. The whole idea of a pile is to transfer loading deep in to the ground. As for finish height of pipes you could trowel them off with a laser level or there are pipe saws available that would cut them pretty accurately. Could also use driven piles instead of concrete.
 