Dont know how I get involved but we have a project where there are some bankings to face with stone, we have about 25 m x 1.5m high at about 45°
Looking to get delivery of stone similar to this
Screenshot_20240107_071001_Chrome.jpg

I know its all dependant of stone size and type but what do we reckon on tonnage for a guestimate ....100t ish ?
@Storrsy :)
 
Storrsy

Storrsy

Well-known member
Dont know how I get involved but we have a project where there are some bankings to face with stone, we have about 25 m x 1.5m high at about 45°
Looking to get delivery of stone similar to this View attachment 56223
I know its all dependant of stone size and type but what do we reckon on tonnage for a guestimate ....100t ish ?
@Storrsy :)
Depends on how deep your wanting the rock to go into the banking for retaining purposes? Here is a photo of a small section I faced. It's an 11 ton load and the wall dimensions are 10m long by 1.2m high.
Personally I'd work on 2 ton a meter for what your looking to do...
2nd pic is a 10 ton load- probably about the size your after? I'd be confident that will face 5meter at 5ft high....
3rd pic is 5 meters long and 7ft high...that was also 10ton...
 

Attachments

  • IMG_2140.JPG
    IMG_2140.JPG
    323.9 KB · Views: 118
  • IMG20230211092746.jpg
    IMG20230211092746.jpg
    481.1 KB · Views: 131
  • IMG20221103111831.jpg
    IMG20221103111831.jpg
    438.2 KB · Views: 120
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Depends on how deep your wanting the rock to go into the banking for retaining purposes? Here is a photo of a small section I faced. It's an 11 ton load and the wall dimensions are 10m long by 1.2m high.
Personally I'd work on 2 ton a meter for what your looking to do...
2nd pic is a 10 ton load- probably about the size your after? I'd be confident that will face 5meter at 5ft high....
3rd pic is 5 meters long and 7ft high...that was also 10ton...
nice way of finishing off a batter :cool::love:
 
Furniss

Furniss

Well-known member
20230530_171601.jpg

Railway sleeper wall and steps on first rise, railway sleeper steps and stone face on 2nd and stone face 3rd.
It was supposed to be handed over for someone else to do but that hasnt come off so we are back in firing line.....
20231016_180852.jpg

Not got the time really !!

See fag packet scribble below.
20240107_072723.jpg
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Furniss

Furniss

Well-known member
Nah it would need a proper grab, a couple of little demo bits have come back in so I will get a grab bought for under the tilty 👍 ....need someone else to do the job really - or at least the sleeper part of it..... anyone fancy a nice little holiday in april/may ? :)
 
V8Druid

V8Druid

do it as well as you can,but learn to do it better
Nah it would need a proper grab, a couple of little demo bits have come back in so I will get a grab bought for under the tilty 👍 ....need someone else to do the job really - or at least the sleeper part of it..... anyone fancy a nice little holiday in april/may ? :)
@doobin ???
 
Last edited:
Storrsy

Storrsy

Well-known member
View attachment 56329
Railway sleeper wall and steps on first rise, railway sleeper steps and stone face on 2nd and stone face 3rd.
It was supposed to be handed over for someone else to do but that hasnt come off so we are back in firing line..... View attachment 56331
Not got the time really !!

See fag packet scribble below.
View attachment 56330
What kind of finish are you expected to put on the stone facing. Massive boulders stacked roughly stepped back at 45% will use up alot more weight than simply stone facing with like the pics I sent above- which would be pitched more like a ratio of 5:2. Both would do the job the latter being more time consuming but a neater finish and less stone required...
 
Furniss

Furniss

Well-known member
What kind of finish are you expected to put on the stone facing. Massive boulders stacked roughly stepped back at 45% will use up alot more weight than simply stone facing with like the pics I sent above- which would be pitched more like a ratio of 5:2. Both would do the job the latter being more time consuming but a neater finish and less stone required...
There are no guidelines really , I suppose it depends on the stones, What I need is a man of your talents 🙂
 
6

6feetdown

Well-known member
Nah it would need a proper grab, a couple of little demo bits have come back in so I will get a grab bought for under the tilty 👍 ....need someone else to do the job really - or at least the sleeper part of it..... anyone fancy a nice little holiday in april/may ? :)
If I wasn't about to start work on mine I'd be tempted lol
 