S
Stroppymonkey
Well-known member
Looking at getting a vertical baler for the workshop. We are continually struggling with cardboard volume. Would expect 1 or 2 bales a week. Needs to be single phase really as 3 phase is on site but would cost a few ££ to get a metered supply organised.
Know nothing about them . This one has popped up locally for sub £1000. Anyone any experience of these things? Thanks
Know nothing about them . This one has popped up locally for sub £1000. Anyone any experience of these things? Thanks