Saw this on Facebook and thought of you guys, seams like a good time to post it
What regulations? Specific to holiday site?uh oh. The base is 3” longer than regulations allow, and here’s a bloke with the rule book arguing the toss with my customers
Not joking !View attachment 44723
We’ve been mixing as well, trusted old belle today though
7k tank turned up Not a single lifting point and we only had 100mm spare between two old steels real ball ache to get it lifted straight to sink it in.
Ridiculous no lifting pointsWe’ve been mixing as well, trusted old belle today though
7k tank turned up Not a single lifting point and we only had 100mm spare between two old steels real ball ache to get it lifted straight to sink it in.
not a lot of use as'd probably be well over the 3.5t loaded and deffo over the 1020kgs emptyView attachment 44730View attachment 44731View attachment 44732View attachment 44733
Saw this on Facebook and thought of you guys, seams like a good time to post it![]()
Those vortex are good units done a few of them.
Yeah we try and steer people towards themThose vortex are good units done a few of them.
tha's a tad weak innit ... 16:1 (800kgs to 50kgs)This is my mixer...
Does a dumpy bag at a time. 2 bags of cement to every bucket of ballast.
tha's a tad weak innit ... 16:1 (800kgs to 50kgs)![]()
I was working on 7 bags of 25kg to 800kg.... 3.5 grading buckets in a Dumpty bag.tha's a tad weak innit ... 16:1 (800kgs to 50kgs)![]()
so it's not a dumpy's worth in the skip then ?? thought he meant 2 bags of cement to a skipfulDouble check that druid.
No, I'd empty the dumpty on the ground and mix in in layers, 1 grading bucket then 2 bags and so on, in the end it was a ton of concrete at a time and worked well for this application, putting in a gulley to protect farm track from road run offso it's not a dumpy's worth in the skip then ?? thought he meant 2 bags of cement to a skipful![]()
![]()
No, I'd empty the dumpty on the ground and mix in in layers, 1 grading bucket then 2 bags and so on, in the end it was a ton of concrete at a time and worked well for this application, putting in a gulley to protect farm track from road run off
N here's me who gets upset if my dumper gets splashed with concrete.We do similar. Or in tipper.
Tipper vans or trailers are good as you can move the material from side to side to mix it so no need to empty on the floor. Although have to be careful as some machine drivers will quite easily bend the sides
aye but smiffy doesn't own the ones he does it inN here's me who gets upset if my dumper gets splashed with concrete.
I gave serious thought to getting the hydraulic one when I got the case, decided against it in the end, can't remember the specific reason nowWould it not be worth upgrading to the hydraulic one. I think I'd would find the benefit is lost if I had to get out of the cab to get it on the right position. Mine is flicked in and out constantly, even use it for things like hanging bulk bags off to bring the weight closer into the machine. RSL ones are good though. Don't even notice it on there.