The 'Today's Job' thread

TiltyShaun

TiltyShaun

Well-known member
Ahhhhhhhhhhhhhh

My ocd just exploded on those joint lines not meeting

I’d have laid a 600mm full width strip on the 45 angle to hide that transition
I don’t have OCD but it hurt my eyes. My reaction was WTF!!
 
Giles

Giles

Well-known member
All it needs is same sizes on corners then inboard cut from the joint, so 2x 900x600 45 degree cut them then 600x600 etc then re-establish brick bond with a easy square cut etc

Builders doing paving, to be fair my dads a builder and does similar but would never dream of it inside on tiled floor etc, best leave it to the Groundworkers next time 😂😂😘
 
Giles

Giles

Well-known member
On the subject of paving we’ve just pointed all this up with flow point liquid screed, very happy with it and now will be our go to.

Proper cement joints not like the sand resin polymerics that go green and then can pop out. Setts eat it up at £15 a bag getting about 1.5m2 per bag but we had to Match existing which had huge joints.
 

Attachments

  • DE35C5DF-EF58-4429-9833-2EE86BA69D15.jpeg
    DE35C5DF-EF58-4429-9833-2EE86BA69D15.jpeg
    299 KB · Views: 137
  • 98CD44DE-D370-4933-839E-B5C90368783C.jpeg
    98CD44DE-D370-4933-839E-B5C90368783C.jpeg
    380.7 KB · Views: 137
  • 61AFEBEA-C6FA-41B0-925E-5A5E082B7FCC.jpeg
    61AFEBEA-C6FA-41B0-925E-5A5E082B7FCC.jpeg
    380.8 KB · Views: 129
  • E29EDEDE-1671-41E9-AE4B-B7F3701902D1.jpeg
    E29EDEDE-1671-41E9-AE4B-B7F3701902D1.jpeg
    402.2 KB · Views: 152
  • 4A5DFFDE-CBE0-4E96-9A51-1E44B13CE035.jpeg
    4A5DFFDE-CBE0-4E96-9A51-1E44B13CE035.jpeg
    409 KB · Views: 163
  • 8E0FCF72-5D83-43F9-9026-4A155B00DBD1.jpeg
    8E0FCF72-5D83-43F9-9026-4A155B00DBD1.jpeg
    195.5 KB · Views: 126
  • ABA6FE7C-947B-42EB-BF6F-46625894855D.png
    ABA6FE7C-947B-42EB-BF6F-46625894855D.png
    207.2 KB · Views: 151
hiluxman

hiluxman

Well-known member
Ahhhhhhhhhhhhhh

My ocd just exploded on those joint lines not meeting

I’d have laid a 600mm full width strip on the 45 angle to hide that transition
Glad I'm not the only one that instantly thought that.

Today we were been critical over losing 10mm on a 58m run of 600x600 concrete flags. I had to say to lad, don't worry about it. Hence why I've found this lad 3 years solid work but others don't even get to 3rd day.
 
Vinpetrol

Vinpetrol

Well-known member
Glad I'm not the only one that instantly thought that.

Today we were been critical over losing 10mm on a 58m run of 600x600 concrete flags. I had to say to lad, don't worry about it. Hence why I've found this lad 3 years solid work but others don't even get to 3rd day.
That’s 1 in 5800 if hes working to that kind of accuracy he’s well worth keeping hold off
 
Furniss

Furniss

Well-known member
On the subject of paving we’ve just pointed all this up with flow point liquid screed, very happy with it and now will be our go to.

Proper cement joints not like the sand resin polymerics that go green and then can pop out. Setts eat it up at £15 a bag getting about 1.5m2 per bag but we had to Match existing which had huge joints.
Is it not worth tapping a board down side so can flood to end of path ? Asking for Bob
Screenshot_20221206-224048_Samsung Internet.jpg
 