Afternoon all.
So I'm over a year into "dealings with" UKPN... they're a fookin nightmare.
Started off as I have a barn which is just over 300sqM on the curtailage of my old farm... and they have a 11kv line which hangs over the top. The barn footing wasn't/isn't substantial enough when built and over the years has started to sink, one corner has broken away - the corner right near the pole holding up the powerline, the surveyor who drew it up for the planning application said that corner was 200mm lower than the rest of the barn... but it looks to be getting worse (dwarf wall has cracked and crack is opening up).
Many UKPN wallys have been out to see it, before I got told the only thing they can do (as the cable cannot be sheithed, or switched off) is put it underground for the run between the poles that pass my barn. The estimate for which is £25k+VAT which naturally they expect me to pay.
At this point I had already ordered a new steel portal frame barn, so I ended up demolishing some old piggeries to get the footprint approved by planning, then UKPN sent a guy out to do a survey (HSS 40 006b) for that work.... as the new barn still needed siting close to the cable, but we needed to know what distance. This survey advised safe working distance from the cable was minimum 6m. I reckon the cable is only 3m off the top of the barn, which is constructed of timber frame, dwarf brick wall, then upper walls and roof cement board/more likely asbestos.
I may of got the barn up I originally wanted to replace this with, but I still have this derolict barn to deal with, which is too close to the powerline to demolish.
I contacted UKPN legal dept to find out when the line went up, as I've got site plans going back to 1939 showing there was a barn in that spot (whether the same or not I am unsure).... they have come back and told me the line was erected in 1962 and was placed "lawfully".
I can't find any info in the deeds, with regards to wayleaves... so I asked them to confirm definition of "lawfully" and they've come back stating "Lawfully place would be at the time of installation it would have been agreed with current landowner in situate".
Appart from asking for supporting documentation, which I'll be surprised if they can access... I don't really know where to go from here.
Any advise?
So I'm over a year into "dealings with" UKPN... they're a fookin nightmare.
Started off as I have a barn which is just over 300sqM on the curtailage of my old farm... and they have a 11kv line which hangs over the top. The barn footing wasn't/isn't substantial enough when built and over the years has started to sink, one corner has broken away - the corner right near the pole holding up the powerline, the surveyor who drew it up for the planning application said that corner was 200mm lower than the rest of the barn... but it looks to be getting worse (dwarf wall has cracked and crack is opening up).
Many UKPN wallys have been out to see it, before I got told the only thing they can do (as the cable cannot be sheithed, or switched off) is put it underground for the run between the poles that pass my barn. The estimate for which is £25k+VAT which naturally they expect me to pay.
At this point I had already ordered a new steel portal frame barn, so I ended up demolishing some old piggeries to get the footprint approved by planning, then UKPN sent a guy out to do a survey (HSS 40 006b) for that work.... as the new barn still needed siting close to the cable, but we needed to know what distance. This survey advised safe working distance from the cable was minimum 6m. I reckon the cable is only 3m off the top of the barn, which is constructed of timber frame, dwarf brick wall, then upper walls and roof cement board/more likely asbestos.
I may of got the barn up I originally wanted to replace this with, but I still have this derolict barn to deal with, which is too close to the powerline to demolish.
I contacted UKPN legal dept to find out when the line went up, as I've got site plans going back to 1939 showing there was a barn in that spot (whether the same or not I am unsure).... they have come back and told me the line was erected in 1962 and was placed "lawfully".
I can't find any info in the deeds, with regards to wayleaves... so I asked them to confirm definition of "lawfully" and they've come back stating "Lawfully place would be at the time of installation it would have been agreed with current landowner in situate".
Appart from asking for supporting documentation, which I'll be surprised if they can access... I don't really know where to go from here.
Any advise?